Arun valley Re-signalling 12/09/2013 at 21:33 #49347 | |
Hooverman
![]() 306 posts |
On the weekend Saturday 26th to Monday 28th October Three Bridges ASCs Panel 7 (not the ROC) will be taking over the Arun Valley Route. Thus bringing an end to the Signalboxes at Billingshurst, Pulborough and Amberly and creating a new fringe with Arundel Signalbox just south of South Stoke Accommodation crossing. Picture 1 is the of the unmodified Panel 7 in its current state, picture 2 is the panel extension waiting to be grafted on to it at the far end.
Post has attachments. Log in to view them. Log in to reply The following users said thank you: John, TimTamToe, BarryM, UKTrainMan, AndyG, markt |
Arun valley Re-signalling 13/09/2013 at 05:07 #49350 | |
pilotman
![]() 189 posts |
Amberley n'est-ce pas?
Log in to reply |
Arun valley Re-signalling 13/09/2013 at 11:53 #49357 | |
John
![]() 884 posts |
I'd like to play with your lego panel! :cheer: That's a heck of a lot of buttons for virtually plain-line track. What are the green buttons for? :huh: Log in to reply |
Arun valley Re-signalling 13/09/2013 at 17:30 #49366 | |
JamesN
![]() 1626 posts ![]() |
Looking at the positioning I'd say they're probably Axle Counter resets?
Log in to reply |
Arun valley Re-signalling 13/09/2013 at 18:07 #49367 | |
Firefly
![]() 521 posts |
Yes, Green Bezels are Axle Counter Resets.
Log in to reply |
Arun valley Re-signalling 13/09/2013 at 21:08 #49369 | |
Hooverman
![]() 306 posts |
" said:Yes, Green Bezels are Axle Counter Resets.Yes Axel Counter Resets and also used to put on and take off Engineers Possession Reminders (EPR). Log in to reply |
Arun valley Re-signalling 21/09/2013 at 16:06 #49492 | |
Hooverman
![]() 306 posts |
The framework for the panel extension has now been grafted onto the existing panel.![]() ![]() Post has attachments. Log in to view them. Log in to reply |
Arun valley Re-signalling 21/09/2013 at 17:25 #49493 | |
markt
![]() 65 posts |
Bear in mind that the current crossovers at Billingshurst and Pulborough (currently signalled by semaphore discs) are being resignalled to a full main aspect. Also additional signal sections are being created so nominally there will be a 4 minute headway.
20 years of Simsigging Log in to reply |
Arun valley Re-signalling 25/03/2014 at 19:45 #57785 | |
John
![]() 884 posts |
Short video of Billingshurst signal box prior to its closure on the 14th March.
Log in to reply |
Arun valley Re-signalling 22/04/2014 at 22:54 #59357 | |
madaboutrains
![]() 316 posts |
Very interesting to see how they built it have you got anymore pictures while they were building it ?
RIP Feltham Panel 1 Log in to reply |
Arun valley Re-signalling 23/04/2014 at 09:09 #59377 | |
Bagnall2067
![]() 17 posts |
If anyone is interested Billingshurst box is currently in the process of being moved to Amberley Museum, adjacent to Amberley station. The top storey arrived some weeks ago, with the lower storey and the frame to follow shortly.
Log in to reply |
Arun valley Re-signalling 23/04/2014 at 09:47 #59379 | |
Hooverman
![]() 306 posts |
Some more pictures were posted in the link below. http://www.SimSig.co.uk/index.php?option=com_kunena&view=topic&catid=23&id=37089&Itemid=0 Log in to reply |