Upcoming Games

(UTC times)


Full list
Add a game

Upcoming Events

No events to display

Who's Online

Barry SB, South Wales

You are here: Home > Forum > Miscellaneous > The real thing (signalling) > Barry SB, South Wales

Page 1 of 1

Barry SB, South Wales 04/05/2014 at 17:36 #60039
DaveHarries
Avatar
1285 posts
Hi all,

Just a quick heads-up. I have read on another forum that the Yellow Peril has been issued for another box in South Wales. Therefore, with effect from 0440hrs on Monday 30-Jun-2014, Barry SB will be closed and all signals controlled from SWCC.

Also, from the same date, Cardiff PSB will loose control of the line between Penarth East Curve and Danescourt to the SWCC Rhymney workstation. The situation will then be that SWCC will fringe to Radyr in both directions, via the City Line and via. Llandaff.

The lines between Barry Island to Barry, along with the Penarth Branch, will be One Train Working (OT(NS)). Leckwith Loop also will come under SWCC (Rhymney Valley Workstation) with the Cogan Loop converted to Passenger working.

I find it odd, however, that the SWCC Rhymney workstation will work from Danescourt to Penarth EC: logic might think that this stretch would come under a temporary IECC-type setup in Radyr IMO.

Anyway, time to get the camera out and get photos if you haven't already done so.

HTIOI,
Dave

Log in to reply
Barry SB, South Wales 04/05/2014 at 18:09 #60043
headshot119
Avatar
4869 posts
Nice to see that Cogan loops will be passed for passengers, it'll help on the occasions they have to send an all shacks ATW out in front of a first stop Bridgend.
"Passengers for New Lane, should be seated in the rear coach of the train " - Opinions are my own and not those of my employer
Log in to reply