Motherwell Panel Box 21/11/2014 at 21:35 #65704 | |
madaboutrains
316 posts |
I was wondering what Motherwell signal box is like now? Has it been sent to the ROCs yet? And is it the same area that the SimSig game for Motherwell control?
RIP Feltham Panel 1 Log in to reply |
Motherwell Panel Box 22/11/2014 at 14:43 #65719 | |
Ron_J
331 posts |
Motherwell SC will go over to West of Scotland SC in two stages, the first being "Motherwell North" in December 2016 which will take everything from roughly Rutherglen, Coatbridge FLT and Benhar Junction to Lanark Junction, including Mossend, Whifflet, Motherwell, Hamilton, Newton etc.. The second stage is planned for 2017 and will take out everything from Lanark Junction to the Southern fringe with Carlisle at Kirkpatrick and West to the fringe with Edinburgh IECC at Auchengrey. Log in to reply |
Motherwell Panel Box 22/11/2014 at 20:04 #65724 | |
madaboutrains
316 posts |
Thank you
RIP Feltham Panel 1 Log in to reply |
Motherwell Panel Box 22/11/2014 at 20:06 #65725 | |
madaboutrains
316 posts |
Just to clarify, Its still 6 panels in the box?
RIP Feltham Panel 1 Log in to reply |
Motherwell Panel Box 22/11/2014 at 21:45 #65734 | |
Ron_J
331 posts |
Yes, arranged in a horseshoe around the supervisor's desk. Panel 6 is treated as two panels but is a single physical panel.
Log in to reply The following user said thank you: madaboutrains |
Motherwell Panel Box 23/11/2014 at 00:13 #65736 | |
madaboutrains
316 posts |
Panel 6 is Carstairs?
RIP Feltham Panel 1 Log in to reply |
Motherwell Panel Box 23/11/2014 at 11:11 #65740 | |
Ron_J
331 posts |
Yes.