Platform 2 Brighton, Length 20/01/2015 at 01:15 #68133
kaiwhara
Avatar
587 posts
Hi All

A quick query. The current (and 2014 timetable) had a pair of 4 car 377's couple on Platform 2 and then proceed to overs Walk via the West Carriage Work. Going off the wiki, each 377/4 is 82m, so the total train length is 164m....

....and that doesn't fit between the Stop Block and 661 Signal.

So, the two questions are, 1) are the wiki lengths accurate, and 2), how much room is there between 661 and the Block?

Andrew

Sorry guys, I am in the business of making people wait!
Log in to reply
Platform 2 Brighton, Length 20/01/2015 at 01:19 #68134
kaiwhara
Avatar
587 posts
Sorry, another question. The Sim Manual doesn't seem to mention this, but is Brighton Goods Reception, Neck, Engineers and the Sidings electrified? I might use them for the Thameslink Stablers that use the new yard on that site if it is....
Sorry guys, I am in the business of making people wait!
Log in to reply
Platform 2 Brighton, Length 20/01/2015 at 02:48 #68135
BarryM
Avatar
2158 posts
" said:
Sorry, another question. The Sim Manual doesn't seem to mention this, but is Brighton Goods Reception, Neck, Engineers and the Sidings electrified? I might use them for the Thameslink Stablers that use the new yard on that site if it is....
Andrew,
I did a test. They are not electrified.

Barry

Barry, Sydney, New South Wales, Australia
Log in to reply
Platform 2 Brighton, Length 20/01/2015 at 05:20 #68138
kaiwhara
Avatar
587 posts
" said:
" said:
Sorry, another question. The Sim Manual doesn't seem to mention this, but is Brighton Goods Reception, Neck, Engineers and the Sidings electrified? I might use them for the Thameslink Stablers that use the new yard on that site if it is....
Andrew,
I did a test. They are not electrified.

Barry
Ta. Lovers Walk it is.

Andrew

Sorry guys, I am in the business of making people wait!
Log in to reply
Platform 2 Brighton, Length 20/01/2015 at 09:29 #68149
TimTamToe
Avatar
664 posts
" said:
Hi All

A quick query. The current (and 2014 timetable) had a pair of 4 car 377's couple on Platform 2 and then proceed to overs Walk via the West Carriage Work. Going off the wiki, each 377/4 is 82m, so the total train length is 164m....

....and that doesn't fit between the Stop Block and 661 Signal.

So, the two questions are, 1) are the wiki lengths accurate, and 2), how much room is there between 661 and the Block?

Andrew
If I remember correctly from my 2012 TT (next on list for updating for loader btw) you need to have the stopping position as far end exact then they will fit / get in via west carriage road

Gareth

Log in to reply
Platform 2 Brighton, Length 03/10/2015 at 09:41 #76472
Hugh
Avatar
37 posts
Hi and Good Morning to all. I'm playing with timetable: 15 October 2009 v 1.4 0n Brighton v 4.0 and still having the same issue with platform 2 as the problem has still not been fixed with regard to trains 2S42 and 5H58 .They are too long after joining and will not go from there to Lovers Walk.
Log in to reply
Platform 2 Brighton, Length 03/10/2015 at 09:54 #76475
Hooverman
Avatar
306 posts
" said:
Hi and Good Morning to all. I'm playing with timetable: 15 October 2009 v 1.4 0n Brighton v 4.0 and still having the same issue with platform 2 as the problem has still not been fixed with regard to trains 2S42 and 5H58 .They are too long after joining and will not go from there to Lovers Walk.
I know it's all to do with the sim and two 4 cars not stopping in the right place for the attachment (which can be edited), but you can always do what we do in real life and go round the houses via Hove and Preston Park and in via 29 points (north end) instead

Log in to reply