(UTC times)
Page 2 of 2
Leamington Spa Released 13/05/2015 at 11:33 #72148 | |
Noisynoel
989 posts |
" said:" said:And thats what is causing the biggest issue with the timetable.Although Princes Risborough was redesigned, all the old track remains, theres basically just an added through road with a few extra routes.They lost the connection between the up platform and the Thame Siding too though. Noisynoel Log in to reply |