Page 1 of 1
Dorking - trains overhanging rear of P1. 18/06/2015 at 08:34 #73497 | |
jc92
3690 posts |
I'm finding that up southern trains are overhanging the end of P1 at dorking, with the TC beyond the LOS board remaining illuminated while trains are stopped at the station. Post has attachments. Log in to view them. "We don't stop camborne wednesdays" Log in to reply |
Dorking - trains overhanging rear of P1. 18/06/2015 at 14:01 #73503 | |
Noisynoel
989 posts |
That is correct, the track is the full length between the two sets of points, however, the shunt signal is at the end of the platform. It doesn't man the trains are overhanging the platform.
Noisynoel Log in to reply |