Upcoming Games

(UTC times)


Full list
Add a game

Upcoming Events

No events to display

Northampton line speeds

You are here: Home > Forum > Simulations > Released > Rugby > Northampton line speeds

Page 1 of 1

Northampton line speeds 10/11/2015 at 21:04 #77584
Jan
Avatar
906 posts
I've found one probable error in the Northampton area: Trains running along the Down Northampton Fast are doing 15 mph over Northampton North Junction - according to the sectional appendix, the bit north of PRY1410 points should allow 30 mph.
Two million people attempt to use Birmingham's magnificent rail network every year, with just over a million of them managing to get further than Smethwick.
Log in to reply
Northampton line speeds 10/11/2015 at 21:20 #77587
GeoffM
Avatar
6376 posts
Online
Bah, ambiguous signs on the scheme plan. EROS* lifted as per the Sectional Appendix version.

However, the speed on the down through P2 was also too high (should have been 20) so the net effect is probably minimal! Am fixing a couple of other things so I won't release just yet.

* Erroneous reduction of speed :whistle:

SimSig Boss
Last edited: 10/11/2015 at 21:21 by GeoffM
Log in to reply
The following user said thank you: Jan
Northampton line speeds 11/11/2015 at 17:00 #77618
Jan
Avatar
906 posts
Another small bit if you haven't spotted it already: The crossover from the U&D Slow to the Down Fast (PRY1416) should be 20 mph. Currently it's 15 mph all the way from the bay platforms.

Edit: On second thoughts, that might be caused by the wrong speed limit on the Down Fast as well.

Two million people attempt to use Birmingham's magnificent rail network every year, with just over a million of them managing to get further than Smethwick.
Last edited: 11/11/2015 at 19:39 by Jan
Log in to reply