Upcoming Games

(UTC times)


Full list
Add a game

Upcoming Events

No events to display

London Bridge

You are here: Home > Forum > Miscellaneous > The real thing (signalling) > London Bridge

Page 1 of 1

London Bridge 29/12/2015 at 08:40 #79324
BarryM
Avatar
2158 posts
Railway signal problems and flooding hit Christmas getaway.View

Barry

Barry, Sydney, New South Wales, Australia
Log in to reply
London Bridge 29/12/2015 at 17:59 #79351
Jay_G
Avatar
54 posts
Uhm, thread title and headline are very misleading. London Bridge isn't suffering signalling problems or bad weather!
Log in to reply
London Bridge 30/12/2015 at 00:57 #79387
BarryM
Avatar
2158 posts
Typical BBC?

Barry

Barry, Sydney, New South Wales, Australia
Log in to reply
London Bridge 30/12/2015 at 01:53 #79388
Sidestick Priority
Avatar
39 posts
Interesting report though.

I see that the Brighton main line has been partially shut for some rather extensive work, and the BBC piece mentions a junction replacement at Purley.

I couldn't find any details on the work in question, does anyone here have any information on what sort of improvements are made?

Log in to reply
London Bridge 30/12/2015 at 04:16 #79391
JamesN
Avatar
1608 posts
Online
" said:
Interesting report though.

I see that the Brighton main line has been partially shut for some rather extensive work, and the BBC piece mentions a junction replacement at Purley.

I couldn't find any details on the work in question, does anyone here have any information on what sort of improvements are made?
No changes, just taking advantage of the festive period to renew all the sets of points at Purley in one hit - the same was done at Stoats Nest a couple of years ago.

Log in to reply
The following user said thank you: Sidestick Priority
London Bridge 30/12/2015 at 08:33 #79392
Soton_Speed
Avatar
285 posts
Online
Pointless in Purley
In Zone 6, no one can hear you scream...
Log in to reply
The following users said thank you: Sidestick Priority, BarryM
London Bridge 30/12/2015 at 09:55 #79393
TimTamToe
Avatar
664 posts
" said:
Interesting report though.

I see that the Brighton main line has been partially shut for some rather extensive work, and the BBC piece mentions a junction replacement at Purley.

I couldn't find any details on the work in question, does anyone here have any information on what sort of improvements are made?
Replacing 16/17 set of points on the four running lines just north of Purley station and also replacing a rail bridge about half a mile south of the station. Think the crane for the bridge in due today. I'll try and get down if I have time but with "emergency" gas repairs on one of the diversion routes about 1/4 mile from the bridge the traffic's not been pretty!

Gareth

Edit: also see the London Reconnections link in Soton's Speed post (above this if newest at bottom) for more info

Last edited: 30/12/2015 at 10:02 by TimTamToe
Log in to reply
The following user said thank you: Sidestick Priority
London Bridge 30/12/2015 at 12:44 #79399
TimTamToe
Avatar
664 posts
Network Rail have tweeted a few pics of the Purley works Here

Gareth

Log in to reply
London Bridge 30/12/2015 at 15:10 #79406
bill_gensheet
Avatar
1413 posts
As far as the rail services go, a compilation of my Gensheet and UKMEMU posts:

London - Gatwick via Streatham fast spur, Sutton and Horsham every 30 minutes is a 7 set cycle (1216 from Victoria is also the 1546). These services meet in platform at Horsham (P3 and P4). As such you get up departures from down side. It was variable but more London from 4 and Gatwick from 3
(RTT not correct for past events as http://www.realtimetrains.co.uk/train/X58728/2015/12/29/advanced was on P3)

Coast -> Redhill services do not use P3 / P4, they use P2 (RTT is correct for the past, RTT&OTT not correct to the future).

The trains are 10 coach due to stopping at Epsom, so there are a good number of 377/3 out and about with 323+311+452, 143+301+322 for example.

The Redhill - Horsham - Littlehampton - split Brighton / (Portsmouth or Southampton) are 8 or 12 car.

From a sim viewpoint busier than normal but it is a clockface so would get tedious after the first hour or two unless gremlins set in.



Bill

Log in to reply
London Bridge 31/12/2015 at 16:33 #79444
benstafford
Avatar
88 posts
And the Purley bridge work is now cancelled due to the wind. Just been down for a look, crane has been removed and they are just putting stuff back on trucks. There is a lot of soil to remove from the road where they made a base for the crane.
Log in to reply