Page 1 of 1
Level Crossing Excess Delay caused by a TCF 21/03/2016 at 22:59 #81299 | |
Andrew G
![]() 552 posts |
It seems unfair to penalise the Signaller with an 'Excess delay to road users' if this is caused by a track circuit failure which then prevents the barriers being raised. If the core code can identify these situations perhaps the penalty and warning message can be suppressed. Log in to reply The following user said thank you: Temple Meads |
Level Crossing Excess Delay caused by a TCF 22/03/2016 at 06:02 #81300 | |
flabberdacks
![]() 679 posts |
" said:It seems unfair to penalise the Signaller with an 'Excess delay to road users' if this is caused by a track circuit failure which then prevents the barriers being raised.I'd love a breakdown between 'Delays caused by you' and 'Delays caused by failures' but I imagine the code required to accurately identify it would be extremely time-consuming to come up with. Especially if it had to determine whether to attribute a delay to the presence of a failure or the signaller's decisions when going around it! Log in to reply |
Level Crossing Excess Delay caused by a TCF 22/03/2016 at 06:47 #81301 | |
Peter Bennet
![]() 5436 posts |
" said:" said:Simulated delay attribution.It seems unfair to penalise the Signaller with an 'Excess delay to road users' if this is caused by a track circuit failure which then prevents the barriers being raised.I'd love a breakdown between 'Delays caused by you' and 'Delays caused by failures' but I imagine the code required to accurately identify it would be extremely time-consuming to come up with. Especially if it had to determine whether to attribute a delay to the presence of a failure or the signaller's decisions when going around it! Peter I identify as half man half biscuit - crumbs! Log in to reply |