Page 1 of 1
Waterloo, August 2017 09/10/2016 at 21:51 #86691 | |
DaveHarries
1285 posts |
Evening all, Thought this would be worth a heads-up. Could make a fun SimSig timetable or two. http://www.networkrail.co.uk/news/2016/sept/passengers-urged-plan-ahead-before-Waterloo-work-August/ Dave Log in to reply |
Waterloo, August 2017 14/10/2016 at 10:25 #86778 | |
jamesP96
2 posts |
Hello I will have the August 2017 Timetable shortly and will upload the SX / SO / SUN versions for Waterloo. i have current WTT applicable to December 2016 James Log in to reply |
Waterloo, August 2017 14/10/2016 at 13:52 #86780 | |
JamesN
1607 posts |
While a look at the proposed WTT would be very interesting, I'd take it with a pinch of salt as public schedules are very fluid until 12 weeks before, sometimes later during significant engineering work. Certainly wouldn't want to be making a cast-iron highly accurate SimSig timetable from a preview/planned WTT from over 8 months prior to the actual block. Log in to reply |