Upcoming Games

(UTC times)


Full list
Add a game

Upcoming Events

No events to display

Who's Online

Person82, waucott, Hap, Meld, Galatea45699, Kage, Djennison (7 users seen recently)

Long Sidings GF

You are here: Home > Forum > Simulations > Released > Peak District > Long Sidings GF

Page 1 of 1

Long Sidings GF 21/12/2017 at 06:34 #104293
jem771
Avatar
102 posts
just wondering, shouldnt there be 2 point leavers for this groundframe?
or does point lever 1 operate the loop at both ends?

dont bother actually, i have worked it out !!!

great sim !!!

Jezz
Last edited: 21/12/2017 at 06:55 by jem771
Reason: None given

Log in to reply
Long Sidings GF 21/12/2017 at 13:17 #104306
KymriskaDraken
Avatar
963 posts
In case anyone else has the same question, the Long Sidings GF is a single lever at the Peak Forest end of the Long Sidings, and the Down Sidings GF is a two lever frame at the Great Rocks Jn end.

Kev

Log in to reply
The following user said thank you: Noisynoel
Long Sidings GF cemex run around 04/01/2018 at 12:53 #104798
Diesel Rider
Avatar
62 posts
I am having major problems with run round and the down sidings gf! Can get loco to down sidings no problem but will not run round via long sidings to the 45 signal it says train 6xxxx in front (the one it just detached from) even though i signalled it from long sidings 1 and then sent it back to sidings or the signal as per gf levers. Should I lock frame and send it via the down goods to P45 at the box and then open long siding gf lever to sent it back to train?
Log in to reply
Long Sidings GF 04/01/2018 at 12:57 #104799
jc92
Avatar
3685 posts
Run rounds enter long sidings then run round on the up main running wrong direction using down sidings GF.
"We don't stop camborne wednesdays"
Log in to reply
The following user said thank you: Diesel Rider