Page 1 of 1
Pitsea CCTV crossing 01/04/2018 at 22:33 #107203 | |
Oddjob
131 posts |
Using the 2015 timetable with the "level crossings enabled" box unchecked, Pitsea CCTV crossing is not disabled whilst all the others are? I discovered this when 5D97 was approaching, signals only cleared after barriers were lowered and crossing clear operated.
Log in to reply |
Pitsea CCTV crossing 01/04/2018 at 23:45 #107206 | |
postal
5265 posts |
Oddjob in post 107203 said:Using the 2015 timetable with the "level crossings enabled" box unchecked, Pitsea CCTV crossing is not disabled whilst all the others are? I discovered this when 5D97 was approaching, signals only cleared after barriers were lowered and crossing clear operated.You are not the first to discover that fact. Have a look at https://www.SimSig.co.uk/Forum/ThreadView/47582?postId=106670. “In life, there is always someone out there, who won’t like you, for whatever reason, don’t let the insecurities in their lives affect yours.” – Rashida Rowe Log in to reply |