Page 1 of 1
New timetable - summer 2016 04/09/2018 at 22:42 #111860 | |
bill_gensheet
1414 posts |
This timetable is from summer 2016 which was when Glasgow Queen St high level was closed for engineering works. This resulted in significant service diversions. The main challenge for signalling is that some services have significant recovery time in the schedules and may need to be held to time at critical locations. Inbound delays are also likely to result in late entries back into the sim for services looping via Queen St low level. Freight, test and ECS trains are as the 2016 WTT Train reporting numbers are simplified and not historically correct. This timetable must be run with the sim in ‘EGIP’ era and tested OK with sim version 4.3. The sim runs from 0400 to 0400 next day Now available in downloads https://www.SimSig.co.uk/File/Details/2149 Log in to reply The following users said thank you: goetta, ajax103, postal, BarryM |
New timetable - summer 2016 07/10/2018 at 23:14 #112531 | |
bill_gensheet
1414 posts |
Minor updates, now v1.1 in downloads Bill Log in to reply The following users said thank you: Hap, BarryM |