New timetable - summer 2016 04/09/2018 at 22:42 #111860
bill_gensheet
Avatar
1414 posts
This timetable is from summer 2016 which was when Glasgow Queen St high level was closed for engineering works. This resulted in significant service diversions.
The main challenge for signalling is that some services have significant recovery time in the schedules and may need to be held to time at critical locations. Inbound delays are also likely to result in late entries back into the sim for services looping via Queen St low level.

Freight, test and ECS trains are as the 2016 WTT

Train reporting numbers are simplified and not historically correct.

This timetable must be run with the sim in ‘EGIP’ era and tested OK with sim version 4.3. The sim runs from 0400 to 0400 next day
Now available in downloads
https://www.SimSig.co.uk/File/Details/2149

Log in to reply
The following users said thank you: goetta, ajax103, postal, BarryM
New timetable - summer 2016 07/10/2018 at 23:14 #112531
bill_gensheet
Avatar
1414 posts
Minor updates, now v1.1 in downloads