Page 1 of 1
Royston platform lengths 27/05/2019 at 04:20 #118478 | |
lqsignal
16 posts |
Does anybody have accurate lengths for the platforms as understood by the sim? From Google Earth I got an approximate measurement of 231m for P1 and 174m for P2.
Log in to reply |
Royston platform lengths 27/05/2019 at 09:09 #118479 | |
Peter Bennet
5402 posts |
The timetable planning rules say 169/236 Peter I identify as half man half biscuit - crumbs! Last edited: 27/05/2019 at 16:53 by Peter Bennet Reason: Grammar Log in to reply |
Royston platform lengths 27/05/2019 at 10:55 #118485 | |
lqsignal
16 posts |
Thanks. I was close!
Log in to reply |
Royston platform lengths 28/05/2019 at 13:11 #118502 | |
clive
2789 posts |
From the actual sim data: Platform 1 (T4464 and T4465): 246 metres Platform 2 (T4454 and T4455): 179 metres Signals K978 and K980 are at the IBJs. Signal K981 is 84 metres and signal K983 is 117 metres from the end of the platform, again at the IBJ. These numbers don't allow for stopping distances, of course. It looks like the Rules allow 10 metres for that. Log in to reply The following user said thank you: JamesN |
Royston platform lengths 03/06/2019 at 15:20 #118712 | |
Ianno
28 posts |
Peter Bennet in post 118479 said:The timetable planning rules say 169/236Timetable Planning Rules (and as it turns out the Sectional Appendix) are out of date; both platforms can comfortably take 12 x 20m formations. No Selective Door Opening is required. Last edited: 03/06/2019 at 15:21 by Ianno Reason: None given Log in to reply |