Upcoming Games

(UTC times)


Full list
Add a game

Upcoming Events

No events to display

Topsham LC cannot be raised when trains are crossing

You are here: Home > Forum > Simulations > Released > Exeter > Topsham LC cannot be raised when trains are crossing

Page 1 of 1

Topsham LC cannot be raised when trains are crossing 26/07/2019 at 12:41 #119616
Albert
Avatar
1315 posts
In the attached save, the crossing is not blocked by any route but can't be raised after arrival of 2B84-05. Happens any time trains cross at Topsham; if a single Down train is passing, the crossing is auto-raised after arrival.
Post has attachments. Log in to view them.
AJP in games
Log in to reply
Topsham LC cannot be raised when trains are crossing 26/07/2019 at 15:23 #119628
jaecallow
Avatar
4 posts
You can manually raise it if you turn off auto-raise
Log in to reply
Topsham LC cannot be raised when trains are crossing 26/07/2019 at 15:30 #119630
JamesN
Avatar
1607 posts
Specifically, auto-raise does not function if a train is approaching from Exmouth. This is a real-life feature on Exmouth Junction Panel which was implemented in a recent sim update.

Jaecallow is correct - if you disable auto raise you will be able to raise the barriers manually.

Log in to reply
Topsham LC cannot be raised when trains are crossing 26/07/2019 at 15:56 #119634
Albert
Avatar
1315 posts
Thanks for explaining. I've added it to the Wiki as I didn't yet see it documented on https://www.SimSig.co.uk/Wiki/Show?page=simulations:exeter:exeteroperation
AJP in games
Log in to reply