Upcoming Games

(UTC times)


Full list
Add a game

Upcoming Events

No events to display

Manchester Picc + Acton Grange Jn Block

You are here: Home > Forum > Simulations > Timetables > Manchester Piccadilly > Manchester Picc + Acton Grange Jn Block

Page 1 of 1

Manchester Picc + Acton Grange Jn Block 30/07/2019 at 12:59 #119749
HST125Scorton
Avatar
1191 posts
I'm currently 25% in building a Manchester Piccadilly + Acton Grange Jn Block 2019 WTT.
With the line closed between Warrington Bank Quay and Weaver Jn due to track renewals at Acton Grange Jn, most of the WCML services are diverted via Manchester Piccadilly and Victoria giving a total of 75% more trains than normal.
xx:55 VT Services from Piccadilly to London Euston has been shelved for Glasgow/Euston & Euston Glasgow Services.

With respect that the sim doesn't have Ordsall Chord present (Maybe in the future) all of TPE services between Piccadilly/Victoria will have to do a reserval at Salford Cresent untimed meaning extra delays.
Also the line between Euxton Jn/Bolton to Salford Cresent has been recently been electrified and line speeds increased to 100mph. Sadly the sim doesn't have this so Bi-Mode 319s, 350s will used.

Services done so far
Freights
Caledonian Sleeper
Cross Country
Transport for Wales

Aaron (AJRO) | Timetable Writer
Log in to reply
The following user said thank you: AlexH