West Croydon P1 peak use in 2012 16/04/2020 at 20:31 #125898 | |
TimTamToe
664 posts |
Hi peeps A query that I've got during testing. According to diagrams and CWN, some SN peak West Croydon's to London Bridge were 10 car 377's formed of 377/3 377/3 377/2 and in 2012 were tt'd to use P1. As in the sim P1 in 10m too short (assume it's the correct length) for this formation does anyone know what used to happen at the time with these SNs. (I know nowadays SN's use turnback and P3 but in 2012 SN's used P1 LO's used the turnback and P3.) I should really know being a yocal but only ever catch from ECR Cheers Gareth Log in to reply |
West Croydon P1 peak use in 2012 16/04/2020 at 21:35 #125907 | |
JamesN
1608 posts |
Is it an aberration in the CWN? All references to platform length at West Croydon show it as 194m without any evidence of it being lengthened at any point
Log in to reply The following user said thank you: TimTamToe |
West Croydon P1 peak use in 2012 17/04/2020 at 09:00 #125915 | |
TimTamToe
664 posts |
JamesN in post 125907 said:Is it an aberration in the CWN? All references to platform length at West Croydon show it as 194m without any evidence of it being lengthened at any pointThanks James, I'll have another look at the timings (has tight turnarounds) and what's on the through plats as they might have put it into P3 Cheers G Log in to reply |
West Croydon P1 peak use in 2012 18/04/2020 at 13:38 #125985 | |
markt
60 posts |
JamesN in post 125907 said:Is it an aberration in the CWN? All references to platform length at West Croydon show it as 194m without any evidence of it being lengthened at any pointIn the current WTT (albeit permanent workings superseded by current events), Saturday night's 2S95 00:20 London Bridge to West Croydon (booked 4+3+3 377) is booked into platform 1. The CWN is correct - I'm not sure what the revised length of platform 1 at WCY was made out to be, but a 10.377 formation definitely fits - and I do recall the 2012 peak workings when the 377/6 fleet were new to Southern. 20 years of Simsigging Log in to reply The following user said thank you: TimTamToe |
West Croydon P1 peak use in 2012 18/04/2020 at 14:04 #125987 | |
JamesN
1608 posts |
markt in post 125985 said:JamesN in post 125907 said:Having reviewed some satellite imagery, it appears to have been lengthened at the buffer-stops end by 11m between April 2011 and March 2012, which would enable 10/377. The impedence bond in the platform doesn't appear to have been moved and thus we can infer that only the buffer-stop end TC has been lengthened.Is it an aberration in the CWN? All references to platform length at West Croydon show it as 194m without any evidence of it being lengthened at any pointIn the current WTT (albeit permanent workings superseded by current events), Saturday night's 2S95 00:20 London Bridge to West Croydon (booked 4+3+3 377) is booked into platform 1. Log in to reply The following user said thank you: TimTamToe |
West Croydon P1 peak use in 2012 18/04/2020 at 18:33 #125999 | |
TimTamToe
664 posts |
JamesN in post 125987 said:markt in post 125985 said:Thanks Mark and James,Having reviewed some satellite imagery, it appears to have been lengthened at the buffer-stops end by 11m between April 2011 and March 2012, which would enable 10/377. The impedence bond in the platform doesn't appear to have been moved and thus we can infer that only the buffer-stop end TC has been lengthened. In light of this is it possible to put it on to Mantis for the TC length to be changed in a next update to the sim Cheers Gareth Log in to reply The following user said thank you: bri2808 |
West Croydon P1 peak use in 2012 18/04/2020 at 18:52 #126000 | |
Meld
1111 posts |
Initial Mantis 29160 passed onto Geoff for TC extension
Passed the age to be doing 'Spoon Feeding' !!! Log in to reply The following user said thank you: TimTamToe |
West Croydon P1 peak use in 2012 18/04/2020 at 20:32 #126004 | |
JamesN
1608 posts |
Sorry Gareth forgot to mention I’d stuck it on mantis earlier, John has quoted the ticket number.
Log in to reply The following user said thank you: TimTamToe |
West Croydon P1 peak use in 2012 25/04/2020 at 09:17 #126289 | |
Hooverman
306 posts |
My memory is a little hazy, but I’m sure you could always fit a 10car in the bay but not 2X5car or any or 6 on 4 or vice versa as there was no standing distance between the cabs until the buffer stops were pushed back.
Log in to reply |