1H90 15th Oct 2009 TT

You are here: Home > Forum > Simulations > Timetables > Three Bridges > 1H90 15th Oct 2009 TT

Page 1 of 1

1H90 15th Oct 2009 TT 30/01/2021 at 20:10 #136893
ajax103
Avatar
1123 posts
I'm not sure if this has been picked up but in the Three Bridges TT supplied this train is only 8 coaches long but in the London Bridge supplied TT this train is 12 coaches long.

Can someone verify which TT is correct please?

Log in to reply
1H90 15th Oct 2009 TT 30/01/2021 at 20:15 #136894
headshot119
Avatar
4869 posts
1H90 0554 Littlehampton > London Bridge

Starts as an 8 car 377 (4+4)
Attaches at Haywards Heath to 1B00 (0637 Brighton > Haywards Heath 4 car 377) and becomes a 12 car 377 (4+4+4)

So both are correct.

"Passengers for New Lane, should be seated in the rear coach of the train " - Opinions are my own and not those of my employer
Log in to reply
The following user said thank you: ajax103