London Bridge ASC 2009-10-15 SX - Additional turnaround rules add-on

You are here: Home > Forum > Simulations > Timetables > London Bridge > London Bridge ASC 2009-10-15 SX - Additional turnaround rules add-on

Page 1 of 1

London Bridge ASC 2009-10-15 SX - Additional turnaround rules add-on 07/11/2021 at 22:35 #142227
Jan
Avatar
907 posts
Online
As far as passenger and ECS workings are concerned, the default 2009 timetable included with the sim only has some rules covering the South London Line workings.

Some time ago, for personal usage I added some additional turnaround rules to the included 2009 Groundhog Day timetable. So that they don't just gather dust on my hard disk, I've now extracted them into a small add-on timetable which can be loaded into the main timetable via Simsig Main Menu -> Timetable -> Open (merge with current).

The rules are compatible with the current v5.2 of the default 2009 timetable and cover the following services:
- Dartford Loop lines (Plumstead/Sidcup/etc. terminators, plus the various loop workings that directly turn around and re-enter the sim area)
- Orpington terminators
- Cannon Street <-> Grove Park sidings ECS workings running off-sim via Blackfriars

Two million people attempt to use Birmingham's magnificent rail network every year, with just over a million of them managing to get further than Smethwick.
Log in to reply
The following users said thank you: bri2808, flabberdacks, phil1044