Retford Track Section Failure 10/05/2022 at 22:17 #146437
Civolics
Avatar
8 posts
Hey,

Just writing this to ask a question about what to do at Retford when having a track section failure. I know I can literally just get rid of it entirely, just inquiring about what to do in these types of situations if a train approaching is scheduled to stop here when a train behind it is a service bypassing the station.

Thanks!


Post has attachments. Log in to view them.
Log in to reply
Retford Track Section Failure 10/05/2022 at 22:21 #146438
Newhampshires
Avatar
101 posts
I believe this would be a scenario where trains end up becoming very delayed, which happens in real life too when lines become blocked!
Log in to reply
Retford Track Section Failure 10/05/2022 at 22:35 #146439
Chromatix
Avatar
190 posts
Yep, I've been on a train stuck on the Down Fast for 40 mins just outside Thirsk after what was described as a "points failure". Thirsk, like Retford, only has platforms on the Slow lines. I bet there were several ECML down expresses stuck behind us.
Log in to reply
Retford Track Section Failure 10/05/2022 at 23:19 #146440
JamesN
Avatar
1607 posts
In real life the Train Operator may elect to not call at Retford, and convey passengers back from Doncaster to Retford on another service, potentially even stopping something additionally.

The points have detection so there’s no rules/technical reason trains couldn’t just bypass Retford; it would be a commercial/passenger matter.

Log in to reply
The following users said thank you: Hap, Civolics
Retford Track Section Failure 11/05/2022 at 12:13 #146443
bugsy
Avatar
1766 posts
If I'm not mistaken, the points just beyond the Track Section failure can be manually set as per the attached screenshot and the trains "talked" past signal D143 to either enter the station platform or continue on the Fast line.
....


Post has attachments. Log in to view them.
Everything that you make will be useful - providing it's made of chocolate.
Log in to reply
Retford Track Section Failure 11/05/2022 at 12:54 #146444
TUT
Avatar
532 posts
Well alas not because the points are locked due to the fact that the route was set for the Down Main and now you've got the track circuit immediately in rear of the one containing the points occupied they're approach locked because the system assumes that's a train traveling at line speed (125mph?) about to hit the points. They can't swing!

In real life you could do a release of signalling controls to allow you to move the points. That is a very rarely used option though and I'm unsure of the logistics of it. You could also presumably get a points operator down there to work them on the ground, but again it's quite unlikely unless the failure is expected to last for a good long while and the disruption of otherwise would be too great. Failing to stop at one station (not even a major interchange) might not justify it...

Last edited: 11/05/2022 at 12:55 by TUT
Reason: None given

Log in to reply
Retford Track Section Failure 11/05/2022 at 14:17 #146445
bugsy
Avatar
1766 posts
TUT in post 146444 said:
Well alas not because the points are locked due to the fact that the route was set for the Down Main and now you've got the track circuit immediately in rear of the one containing the points occupied they're approach locked because the system assumes that's a train traveling at line speed (125mph?) about to hit the points. They can't swing!

I should have realised that but wasn't thinking owing to brain shrinkage

Everything that you make will be useful - providing it's made of chocolate.
Log in to reply
Retford Track Section Failure 11/05/2022 at 14:43 #146447
Sacro
Avatar
1171 posts
TUT in post 146444 said:
(not even a major interchange)
It is if you're trying to get to Lincoln, or Worksop.

Log in to reply
Retford Track Section Failure 11/05/2022 at 16:29 #146451
Civolics
Avatar
8 posts
Thankfully, I don't have to lol.
Log in to reply
Retford Track Section Failure 12/05/2022 at 02:13 #146460
Jsun
Avatar
212 posts
If the operator elects to wait it out are they responsible for the trailing delays or is it still on the party responsible for the original issue?
Log in to reply
Retford Track Section Failure 12/05/2022 at 03:33 #146461
jc92
Avatar
3685 posts
Jsun in post 146460 said:
If the operator elects to wait it out are they responsible for the trailing delays or is it still on the party responsible for the original issue?
Technically its on NR as an infrastructure fault, but practically I can't see an operator waiting it out due to the impact it would have on theirs and others services in the meantime.

"We don't stop camborne wednesdays"
Log in to reply
Retford Track Section Failure 18/05/2022 at 13:21 #146529
Guts
Avatar
604 posts
TUT in post 146444 said:
Well alas not because the points are locked due to the fact that the route was set for the Down Main and now you've got the track circuit immediately in rear of the one containing the points occupied they're approach locked because the system assumes that's a train traveling at line speed (125mph?) about to hit the points. They can't swing!

In real life you could do a release of signalling controls to allow you to move the points. That is a very rarely used option though and I'm unsure of the logistics of it. You could also presumably get a points operator down there to work them on the ground, but again it's quite unlikely unless the failure is expected to last for a good long while and the disruption of otherwise would be too great. Failing to stop at one station (not even a major interchange) might not justify it...
I've never in all my years seen a release of controls. They generally sent the MOM out and s/he would manually pump the points over and we'd be talking by till it gets fixed.

Log in to reply
Retford Track Section Failure 18/05/2022 at 16:51 #146533
Stephen Fulcher
Avatar
2078 posts
I’ve done it twice, once due to a points run through where nothing was foul of the adjacent main line but the points (mechanical) were track locked the wrong way, and once due to an interlocking fault at Plymouth that locked the main to main crossover reverse.

The main issues with releasing controls are the wide area over which train movements cannot happen - everything has to be at a complete stand in the whole interlocking area, and finding a suitably competent person to conduct the release.

Log in to reply
Retford Track Section Failure 18/05/2022 at 16:52 #146534
Stephen Fulcher
Avatar
2078 posts
jc92 in post 146461 said:
Jsun in post 146460 said:
If the operator elects to wait it out are they responsible for the trailing delays or is it still on the party responsible for the original issue?
Technically its on NR as an infrastructure fault, but practically I can't see an operator waiting it out due to the impact it would have on theirs and others services in the meantime.
I believe there is some sort of clause that operators still have to make best endeavours to prevent excessive delays irrespective of who is accountable for the initial incident.

Log in to reply