09-10-2015 SX errors 5S99

You are here: Home > Forum > Simulations > Timetables > Liverpool Lime Street > 09-10-2015 SX errors 5S99

Page 1 of 1

09-10-2015 SX errors 5S99 26/01/2023 at 08:04 #150272
axmh
Avatar
61 posts
Just started to play the default wtt of 09-10-2015 SX..

Opened up F4 to look at the timetable list querying the 5S99 from Neck Siding as a train is supposed to be in P8 but find it is not existing.

See pics attached

Is there supposed to be a train for linking in P8 and Neck sidings?

Thanks




Apologies if my attached pics is too small as trying to figure out best way.

Post has attachments. Log in to view them.
Last edited: 26/01/2023 at 08:05 by axmh
Reason: None given

Log in to reply
09-10-2015 SX errors 5S99 26/01/2023 at 18:27 #150274
bill_gensheet
Avatar
1431 posts
No

For 00:00 start:
2F995 gives you 5S99
5S99 to Neck
5S99 joins 5S61S and becomes 5F541 in the neck
5F541 to station P3
Away as 2F541

For 04:45 start
5F541 seeds in neck
5F541 to station P3
Away as 2F541

Looks like the analysis gets a bit confused with the two trains with ID the same (5S99, 5F541)
If you change the 5S541 that seeds to be 5S54S it clears up the analysis report.

Log in to reply
The following user said thank you: axmh