Page 1 of 1
York Winter 1999 Timetable 03/10/2023 at 13:36 #153509 | |
0D07
91 posts |
Afternoon, During Testing of a timetable that I have written for the York North/South Sim. I have encountered a few issues with the Gascoigne Wood Panel and looking through the MANTIS Incident Tracker these issues have been reported before and the tickets that have been raised have been raised for around 12 Months. The issues are Up Side (Coal/Stone Bunker) :- 1) Missing path between Loading Line 6 & 7 (Mantis Mantis 35571) 2) No path between C14 & C34 Signals and M702 (Maintis Mantis 35651) Down Side :- 1) Route from GW5919 signal to GW1843 Signal is not permissive. (I can confirm it is permissive i have ran round trains on the loop in my day job) 2) Locomotives don't reverse properly in the head shunts behind GW5924 & GW5915 (loco showing in up direction when the F2 will show the loco in the Down Direction & v.v. ) Can I ask when these issues are likely to be resolved as stated they have been open tickets for year if not longer. I would love to see them resolved as I would love to release this timetable to all but until they are I cant see much point in releasing it as users/players will come across the same issues that I have done. Thanks, Zero Delta Zero Seven Last edited: 03/10/2023 at 13:42 by 0D07 Reason: None given Log in to reply |
York Winter 1999 03/10/2023 at 19:37 #153513 | |
GeoffM
6376 posts |
I don't have a specific timeline for this one at the moment, sorry. It will happen, just not sure when.
SimSig Boss Log in to reply The following user said thank you: KCRCRailway |