Page 1 of 1
Preferred Routes 18/02/2024 at 12:09 #155400 | |
Splodge
716 posts |
With the amount of via button routes available around Doncaster, are any routes deemed to be preferable (where not using the flexibility to route around another movement) to provide a faster route? For example from D300 you have three routes into both P1 and P3 - via D298, Via button G and Via button K. In both platforms' case, the route appears to be the same restriction signalling wise but does K, for example, allow a higher turnout speed over G? There's the right way, the wrong way and the railway. Log in to reply |
Preferred Routes 18/02/2024 at 17:43 #155408 | |
GeoffM
6376 posts |
Mantis 40319. It's a good idea but I need some time to work through the list.
SimSig Boss Log in to reply |