Upcoming Games

(UTC times)


Full list
Add a game

Upcoming Events

No events to display

Who's Online

Person82, cdoward, geswedey (3 users seen recently)

Warrington Overlap

You are here: Home > Forum > Simulations > Released > Warrington PSB > Warrington Overlap

Page 1 of 1

Warrington Overlap 05/05/2024 at 09:00 #156197
Banners88
Avatar
112 posts
Is there any reason why the overlap through Warrington, PL2 doesn't drop out when the train comes to stand?


Post has attachments. Log in to view them.
Log in to reply
Warrington Overlap 05/05/2024 at 10:24 #156198
Stephen Fulcher
Avatar
2078 posts
It may be because the train is too long and hanging over in the rear.
Log in to reply
Warrington Overlap 05/05/2024 at 10:42 #156199
HST125Scorton
Avatar
1191 posts
Unsure but happens if the train is over 280meters. Yes the platform is 250meters according to the simulation notes. If the train is 250meters or smaller the overlap times out as should, but I think this is to do with the rear of the train still on the section at the rear. The overlap does timeout after 120sec in real life regardless on how big the train is, this was explained when I visited the PSB a few months ago after changes were made in the area. Unknown if that will be reflected in the sim at a later date.
Aaron (AJRO) | Timetable Writer
Last edited: 05/05/2024 at 10:43 by HST125Scorton
Reason: None given

Log in to reply
Warrington Overlap 05/05/2024 at 13:53 #156202
Soton_Speed
Avatar
285 posts
Mantis Ticket 40633 applies?
In Zone 6, no one can hear you scream...
Last edited: 05/05/2024 at 13:54 by Soton_Speed
Reason: formatting

Log in to reply
The following user said thank you: Banners88