Page 1 of 1
Rugby SCC train entering 10 mph MKC DF non stop 30/05/2024 at 22:45 #156431 | |
BenWright
198 posts |
Train 0F94 has entered the down fast at Milton Keynes instead of the down slow as I interposed a block on the down slow as there was a freight train due a crew change at NMP that would block the platforms as it was running early and all trains were running as normal but via the down fast except for 0F94 which entered at 10 mph and isn't increaing its speed. I've checked the train info and it's max speed is set to 75 mph so I'm unsure as to why it's doing that. I've attached a save game and a screenshot
Post has attachments. Log in to view them. Last edited: 30/05/2024 at 22:45 by BenWright Reason: None given Log in to reply |
Rugby SCC train entering 10 mph MKC DF non stop 30/05/2024 at 22:46 #156432 | |
BenWright
198 posts |
Screenshot attachment Post has attachments. Log in to view them. Log in to reply |
Rugby SCC train entering 10 mph MKC DF non stop 30/05/2024 at 23:06 #156433 | |
Hap
1048 posts |
Good evening Ben Thanks for reporting. We can see that the track circuit TKREG is set for 10mph for frieght. The linespeed should be set at 110mph and then freight rules take hold to limit the trains speed. Mantis 40914 Thanks Craig How to report an issue: www.SimSig.co.uk/Wiki/Show?page=usertrack:reportanissue Log in to reply The following user said thank you: BenWright |