Page 1 of 1
2000 era seemingly has impossibly fast trains on the Looe branch 13/09/2024 at 18:57 #158510 | |
Robyn
74 posts |
I have a train 6U01 testing that has just departed from Liskeard Yard GF on the DN at 0057 and has seemingly departed Coombe No.1 GF less than 60 seconds later at 0058. Now, these location are 1 and 3/4 miles apart and I know for a fact that those times are not correct. seeing as with a passenger train this journey takes 5 1/2 minutes and it should be at least that for a freight train. I'm suspecting the trigger point for Liskeard Yard GF DN is in the wrong location. Post has attachments. Log in to view them. 7-5-5, closing of comment Log in to reply |
2000 era seemingly has impossibly fast trains on the Looe branch 13/09/2024 at 19:38 #158511 | |
GeoffM
6376 posts |
Robyn in post 158510 said:I have a train 6U01 testing that has just departed from Liskeard Yard GF on the DN at 0057 and has seemingly departed Coombe No.1 GF less than 60 seconds later at 0058.Cornish High Speed Rail has arrived. Mantis 41384 SimSig Boss Log in to reply |
2000 era seemingly has impossibly fast trains on the Looe branch 14/09/2024 at 11:05 #158523 | |
Stephen Fulcher
2078 posts |
Robyn in post 158510 said:I have a train 6U01 testing that has just departed from Liskeard Yard GF on the DN at 0057 and has seemingly departed Coombe No.1 GF less than 60 seconds later at 0058.You need to timetable the train to stop at Liskeard Yard Ground Frame as it would need to be operated in reality to let the train from the yard to the branch. Log in to reply |
2000 era seemingly has impossibly fast trains on the Looe branch 14/09/2024 at 16:42 #158528 | |
Robyn
74 posts |
Stephen Fulcher in post 158523 said:Robyn in post 158510 said:Good point, well made. Forgot about that part.I have a train 6U01 testing that has just departed from Liskeard Yard GF on the DN at 0057 and has seemingly departed Coombe No.1 GF less than 60 seconds later at 0058.You need to timetable the train to stop at Liskeard Yard Ground Frame as it would need to be operated in reality to let the train from the yard to the branch. 7-5-5, closing of comment Last edited: 14/09/2024 at 16:43 by Robyn Reason: None given Log in to reply |