Page 20 of 31
Forthcoming Timetables 21/06/2020 at 10:13 #127743 | |
postal
5265 posts |
ajax103 in post 127740 said:Thank you, one question though about your WCML Covid19 timetables and when you say the they will be re-released, will they have as a example in the timetable title: WCML Covid Timetables 230420 - Rugby Centre for example? So one knows that they are the latest version of that timetable.As I understand it, there is a SimSig policy decision that TTs released through the site should not have any version information included in the title. This is required for those TTs bundled with a sim so that they can be updated automatically through the Update process. This has been carried over into user-contributed TTs in the interests of consistency. If you want to check the compare the version number of a TT available in the Download section with the version you currently have, click on the link to Details where the TT writer should show the version number. “In life, there is always someone out there, who won’t like you, for whatever reason, don’t let the insecurities in their lives affect yours.” – Rashida Rowe Log in to reply |
Forthcoming Timetables 21/06/2020 at 10:25 #127744 | |
Chrisrail
384 posts |
postal in post 127743 said:ajax103 in post 127740 said:Morning AllThank you, one question though about your WCML Covid19 timetables and when you say the they will be re-released, will they have as a example in the timetable title: WCML Covid Timetables 230420 - Rugby Centre for example? So one knows that they are the latest version of that timetable.As I understand it, there is a SimSig policy decision that TTs released through the site should not have any version information included in the title. This is required for those TTs bundled with a sim so that they can be updated automatically through the Update process. This has been carried over into user-contributed TTs in the interests of consistency. They have all been tinkered / modified. They will be uploaded together with the same discription / notes. Those will be the ones you want Log in to reply The following user said thank you: ajax103 |
Three Bridges April 2012 21/06/2020 at 12:08 #127755 | |
TimTamToe
664 posts |
Hi All, Apologies for the delay, it's been a difficult time recently. Nothing too major has cropped up in testing so far, just a few "Homer" moments to sort really. The other issue regarding lengths at West Croydon is on Mantis and hopefully will be corrected in the next sim update, to save me having a bit of tinkering to do. G Log in to reply The following user said thank you: bri2808 |
Forthcoming Timetables 27/06/2020 at 16:40 #128246 | |
GW43125
495 posts |
An update on Rugby December 2018. Train entry is almost complete, save for a couple of troublesome test trains. Then I've just got the gremlins to deal with (one day I'll learn not to mix water and small creatures), but I should be heading into testing in the next couple of weeks, provided there are no major catastrophes. Sorry to keep you all waiting, but now Uni is out the way development has sped up somewhat! Log in to reply |
Forthcoming Timetables 29/06/2020 at 15:33 #128532 | |
jc92
3687 posts |
With Chester finally released I can confirm I'm currently working on a "wales and NW 1991" set of timetables, which will cover Hereford, Shrewsbury, NE Wales, Madeley (should it be produced) Chester, NWC, Cheshire Lines and potentially Warrington if I ever get the time. Shrewsbury and Hereford are almost complete and NE wales is part written. NWC is released but will require some UID updates to chain correctly. Cheshire lines is almost complete but will require a chainable version to chester without the services using the line between Mouldsworth and Helsby. There is also some provision way down the line for some of Whatleps 1991 Manchester area timetables to have chainable versions created aswell, although I'm not guaranteeing this at all. "We don't stop camborne wednesdays" Log in to reply The following users said thank you: sloppyjag, bossman, Phil-jmw |
Forthcoming Timetables 29/06/2020 at 20:25 #128554 | |
whatlep
377 posts |
While JC92 is doing 1991 for the Mid Cheshire line, I'm working on 1985, plus either 1987 or 1989. 1977 is a gleam in the eye too, but that'll have to wait for some Mantis fixes. I'm pondering doing 1985 for the Chester sim too, unless that conflicts with someone else's activity. Log in to reply The following user said thank you: Phil-jmw |
Forthcoming Timetables 02/07/2020 at 20:17 #128827 | |
swiftaw
271 posts |
officer dibble in post 122668 said:If you need a tester for this, I'm willing Log in to reply |
Forthcoming Timetables 03/07/2020 at 11:31 #128863 | |
whatlep
377 posts |
whatlep in post 128554 said:While JC92 is doing 1991 for the Mid Cheshire line, I'm working on 1985, plus either 1987 or 1989. 1977 is a gleam in the eye too, but that'll have to wait for some Mantis fixes.Just to expand on my previous post, 1985 and 1989 are in active development and not far off ready, subject to a couple of Sim FAQ items being sorted. 1989 is a real challenge with trains at under 10 minute intervals on the "country" section of the line in the evening peak and reversals at Plumley West. Log in to reply |
Forthcoming Timetables 11/08/2020 at 17:14 #130564 | |
officer dibble
409 posts |
- New Street 1992 has been completed, however as I am totally useless at trying to timetable joins and splits on mail trains without tying the station in knots, a kind-hearted soul is currently running through them so they make sense and to sort the issues I have given them! - New Street Summer 2020 Trent Valley diversions for the weekend of the 25th & 26th July are progressing well, with unit allocations well under way on the Saturday TT. Once completed I will do the same to the Sunday TT. When in doubt - Contingency plan 2A. Someone didn't buy the milk - 2A. Someone sneezed at Swansea - 2A. A driver complains the cab is too cold - 2A. Unable to operate a HEx service 4 vice 8 - 2A. Points failure at Ipswich - 2A. Landslip at Pitlochry - 2A Log in to reply The following users said thank you: GeoffM, JamesN, ccobh, ajax103, bri2808, haydenrobertson, Rossy, sloppyjag, Phil-jmw, bossman, phil1044 |
Forthcoming Timetables 12/08/2020 at 09:44 #130576 | |
phil1044
161 posts |
Just to add my latest project into the list. I'm currently re-writing my Leeds East West Summer 2018 timetable (which will end up as version 3), sorting a few timetable errors and doing a bit of tidying up, as well as giving all trains their official UIC number. On top of this I'm compiling a new Leeds North West timetable for the same period which will then chain with the East West timetable. They will both be released at the same time when completed and tested. Both timetables will be my usual 5 day Mon-Fri with lots of rules to make it as real (and mischievous) as possible. Phil. Log in to reply The following users said thank you: VInce, haydenrobertson |
Forthcoming Timetables 12/08/2020 at 13:15 #130580 | |
bill_gensheet
1413 posts |
3 Central Scotland updates in the approval loop The 'training' timetable 1993 - passenger only 1993 - full, now with 'day of the week' decision covering Tuesday to Friday. These now chain to the Edinburgh / Motherwell timetables. Next off will be a 1984 compatible set for CSCOT (significant update), Motherwell (minor update) and Edinburgh (new). A revised Cowlairs 1984 will also come out. Bill Log in to reply The following users said thank you: tynie123, Splodge, phil1044, Phil-jmw |
Forthcoming Timetables 31/08/2020 at 13:59 #131141 | |
Champs450007
97 posts |
Feltham 2020 timetable currently about 60% completed from the saturday just gone with engineering works between Twickeham/Hounslow - Staines with some services doing shunts at Twickenham and all services at Staines doing shunts. Bit of creative license with one shunt at Staines because of a shunt signal not in the timetable editor and 10 Car 458's reduced to 160m from 200m to fit in Reading 4A/B platforms.
Log in to reply The following user said thank you: phil1044 |
Southern April 2012 Series 01/09/2020 at 11:00 #131172 | |
TimTamToe
664 posts |
Hi All, Updates as follows... The majority are all ready for release just a few things to tweak or check. I'm planning to update / release all of them together so that they all should be compatible for chaining. I'm just waiting for the version history changes to the sims, to see what I may need to tinker with, as on first looking, a previously sorted pathing problem in London Bridge around New Cross Gate as crept back in since the latest sim update Three Bridges April 2012 - Just need to double check what has been updated in sim and write description / notes etc London Bridge April 2012 - Pathing error has crept back in - needs developer attention Horsham April 2012 - Ready Oxted April 2012 - Ready East Coastway April 2012 - Ready Victoria Central & South Eastern April 2012 - Need to check since sim updates Cheers Gareth Log in to reply The following users said thank you: phil1044, bri2808 |
Forthcoming Timetables 01/09/2020 at 13:29 #131181 | |
madaboutrains
316 posts |
Champs450007 in post 131141 said:Feltham 2020 timetable currently about 60% completed from the saturday just gone with engineering works between Twickeham/Hounslow - Staines with some services doing shunts at Twickenham and all services at Staines doing shunts. Bit of creative license with one shunt at Staines because of a shunt signal not in the timetable editor and 10 Car 458's reduced to 160m from 200m to fit in Reading 4A/B platforms.Now that would be intresting to play the service which I planned for work!. Bit of a pain the Up Main shunt signal at Staines isnt in the SimSig tho. RIP Feltham Panel 1 Log in to reply |
Forthcoming Timetables 01/09/2020 at 14:18 #131184 | |
Champs450007
97 posts |
I thought the same about seeing the 2 Kingston rounders I drove saturday with a 458 lol. Yeah annoying really F467 is there but there's no location for it in the timetable editor so having to use F461. Log in to reply The following user said thank you: madaboutrains |
Forthcoming Timetables 01/09/2020 at 14:26 #131185 | |
whatlep
377 posts |
Manchester Piccadilly heritage timetables are gradually getting looked at and updated where possible for the ARS version of Piccadilly. 1996 and 1989 will be first to be reissued. I'll start a separate thread to track progress.
Log in to reply The following user said thank you: phil1044 |
Forthcoming Timetables 01/09/2020 at 18:44 #131207 | |
Steamer
3985 posts |
Champs450007 in post 131184 said:I thought the same about seeing the 2 Kingston rounders I drove saturday with a 458 lol.I've logged a request for it to be added (#31459), but the developer is no longer active, so don't hold your breath. "Don't stress/ relax/ let life roll off your backs./ Except for death and paying taxes/ everything in life.../ is only for now." (Avenue Q) Log in to reply The following users said thank you: madaboutrains, Champs450007 |
Forthcoming Timetables 24/09/2020 at 16:17 #132664 | |
bill_gensheet
1413 posts |
bill_gensheet in post 130580 said:On the plus side, Edinburgh 84 now has all the trains in place, and now under test at v0.1. As with many heritage timetables I expect this is a fair amount of work as the trip notice (1981), the freight timetables (1983/1984) and the passenger timetable (May 1984) were not all applicable on the same day. On the minus side, Motherwell 84 now needs much more work with 200+ trains needing to be fixed on top of the chain amendments for Edinburgh. Bill Log in to reply The following users said thank you: Soton_Speed, lazzer, phil1044 |
Forthcoming Timetables 16/10/2020 at 19:23 #133136 | |
Rocangus
52 posts |
As posted elsewhere, started P'borough 2020 summer weekday just now and working hard on that.
Log in to reply |
Forthcoming Timetables 17/11/2020 at 15:07 #133936 | |
GW43125
495 posts |
I have started a Marylebone November 2020. This will consist of two versions, one with LUL and one without. Aiming for a release at some point around Christmas or early next year, uni permitting. Log in to reply The following user said thank you: haydenrobertson |
Forthcoming Timetables 17/11/2020 at 15:14 #133937 | |
haydenrobertson
56 posts |
GW43125 in post 133936 said:I have started a Marylebone November 2020. This will consist of two versions, one with LUL and one without.Christmas 2022? Log in to reply |
Forthcoming Timetables 17/11/2020 at 15:22 #133939 | |
GW43125
495 posts |
haydenrobertson in post 133937 said:GW43125 in post 133936 said:You, sir, are a git.I have started a Marylebone November 2020. This will consist of two versions, one with LUL and one without.Christmas 2022? ;) [Admins: we're just having a laugh, please don't have a go at him] Log in to reply The following user said thank you: haydenrobertson |
Forthcoming Timetables 17/11/2020 at 18:45 #133946 | |
phil1044
161 posts |
My next timetable for release will be West Yorkshire Oct 2018, again a 5 day timetable based on what actually ran that week. It will chain with my other three Leeds area timetables from the same week when finished. The passenger side is now finished, the freight is proving a bit more awkward tho so bear with me. Should be a good 'un tho ! Log in to reply The following users said thank you: headshot119, Mikhail, Soton_Speed |
Forthcoming Timetables 17/11/2020 at 22:35 #133958 | |
haydenrobertson
56 posts |
I have started "Manchester SX November 2020" timetable. It will be based on Friday 6th November this year, and will include everything on that day that actually run. It may include a couple extra things (like test train etc) who knows? I haven't got to that part yet. So far, the Avanti, TPE, TfW and only a handful Northern services have been added so far. I have the rest of the Northern services, along with all of the XC CrossCountry to implement. Freight is on the todo list. But is going to be quite the challenge. Log in to reply |
Forthcoming Timetables 17/11/2020 at 23:38 #133959 | |
Splodge
719 posts |
Doh - I’ve just started one based on Friday 13th as much if it can be derived from my earlier 2020 TT. I’ll put mine on hold, no point in having two just a week apart as the only thing different will be a few ECS moves.
There's the right way, the wrong way and the railway. Log in to reply |