HST125Scorton in post 151271 said:Another update for where I am on timetables. Quite a lot of planned timetables were planned on my last update. Now with Crewe Released I have expanded my territory.. After talking to a member here I have decided on a plan although this will take a while to successfully complete. I’m aiming to do a complete chain of timetables from Wembley ML to Warrington (Via Rugby/Trent Valley/Stafford). With a missing section of WCML at Preston, I’ll continue forward and include one for Carlisle. As for Motherwell which I also been thinking of to add I have decided for now to leave out. This mainly due to the works for the Carstairs Remodelling which has changed the layout completely.Can't wait for the WCML timetables. Going to be amazing chaining it all together! Log in to reply The following user said thank you: Champs450007 |
Forthcoming Timetables 21/04/2023 at 18:35 #151360 | |
Benjwri
11 posts |
Currently working on a number of timetables, encompassing the GWR network with the currently available sims with the May 2023 timetable Temporary Timetables Oxford Blockade - W/C 24/4/23 - Passenger services timetabled, awaiting unit allocations May 2023 Timetables (In order of work) Westbury - Passenger services timetabled, awaiting unit allocations Swansea - In Progress Plymouth - Planned Exeter - Planned Newport - Planned Cardiff - Planned Swindid - Planned Oxford - On Hold for end of blockade Tentative May 2023 Timetables - Timetables I am planning to write, dependant on purchasing the simulations when I get to them Hereford Salisbury Portsmouth Southampton Last edited: 21/04/2023 at 18:35 by Benjwri Reason: None given Log in to reply The following user said thank you: tigermatt |
Forthcoming Timetables 25/04/2023 at 10:17 #151461 | |
jason
8 posts |
Has anyone even thought of doing a new timetable for North Kent and London Bridge Modern day era? North Kent has not even got a single new timetable and all the others dont really need new ones as far as im concerned lol. Log in to reply |
Forthcoming Timetables 25/04/2023 at 10:37 #151462 | |
tigermatt
2 posts |
I look forward to the western region, Exeter in particular, and very happy to provide assistance with testing
Log in to reply |
Forthcoming Timetables 27/04/2023 at 11:28 #151525 | |
GW43125
495 posts |
jason in post 151461 said:Has anyone even thought of doing a new timetable for North Kent and London Bridge Modern day era?Problem is, London Bridge has a completely new layout, a modern timetable on old LB would be completely unworkable. Log in to reply |
Forthcoming Timetables 27/04/2023 at 15:08 #151538 | |
TimTamToe
664 posts |
jason in post 151461 said:Has anyone even thought of doing a new timetable for North Kent and London Bridge Modern day era?Hi Jason, I don't know about North Kent but certainly for London Bridge it is impossible to do a modern day tt, because of the huge changes that occurred at the station with the Thameslink project where more through platforms were created at the expense of terminus platforms along with a heap load of track / point / junction work to accommodate it all. (hadn't noticed G-dub's post above when i posted) Last edited: 27/04/2023 at 15:09 by TimTamToe Reason: None given Log in to reply |
Forthcoming Timetables 28/04/2023 at 15:37 #151571 | |
officer dibble
409 posts |
Crewe - April 2023 - based on the workings for Tuesday 18th. Turned out to be quite the day for varied freight workings. All schedules are in, have started allocating next workings & I have just ripped all the freight consists required for that day. Will be ready in due course. When in doubt - Contingency plan 2A. Someone didn't buy the milk - 2A. Someone sneezed at Swansea - 2A. A driver complains the cab is too cold - 2A. Unable to operate a HEx service 4 vice 8 - 2A. Points failure at Ipswich - 2A. Landslip at Pitlochry - 2A Last edited: 28/04/2023 at 15:37 by officer dibble Reason: None given Log in to reply The following user said thank you: AlexH |
Forthcoming Timetables 28/04/2023 at 19:28 #151578 | |
ajax103
1120 posts |
GW43125 in post 151525 said:jason in post 151461 said:Very true, although there are simulations out there with multiple eras such as West Hampstead, Three Bridges and Doncaster South etc, the risk is if a new era is added even if the information was there and it was possible than the risk remains that the change could break existing timetables.Has anyone even thought of doing a new timetable for North Kent and London Bridge Modern day era?Problem is, London Bridge has a completely new layout, a modern timetable on old LB would be completely unworkable. Even if a Three Bridges ROC but with the London Bridge panels was available, apart from London Bridge itself and the route to Blackfriars I don't think much changed? Which leaves either the 2009 or 2012 timetables to use on the existing London Bridge sims Log in to reply |
Forthcoming Timetables 30/04/2023 at 11:22 #151641 | |
HST125Scorton
1191 posts |
Deleted
Aaron (AJRO) | Timetable Writer Last edited: 30/04/2023 at 16:15 by HST125Scorton Reason: None given Log in to reply |
Forthcoming Timetables 02/05/2023 at 22:08 #151649 | |
GeoffM
6376 posts |
I don't think this has been an issue up until recently, but for the record, we are unlikely to approve any timetables dated on our (as of writing) three "groundhog days". This is for several reasons: - The timetable must be compatible with surrounding sims - - Complex decisions have to be consistent across sims - - Custom(ised) UIDs must work across sims - We cannot ensure the quality of such a TT if we have no control over it, which reduces the value of TTs that we do release officially - We don't want to have imitations of official releases, even if not intended to appear official - We may have plans to release any "missing" groundhog day timetables in the future. The relevant dates: 2009-10-15 2015-04-08 2019-01-09 Thanks SimSig Boss Last edited: 03/05/2023 at 15:53 by GeoffM Reason: None given Log in to reply |
Forthcoming Timetables 02/05/2023 at 22:47 #151650 | |
Sam Tugwell
494 posts |
Benjwri in post 151360 said:Currently working on a number of timetables, encompassing the GWR network with the currently available sims with the May 2023 timetableJust bear in mind that any post December 2021 timetable for Exeter will run into issues with the Okehampton trains as the line speed in the sim has not been updated in line with the full reopening of the line. The trains will take a good while longer to traverse the section in the sim than what is timetabled today. "Signalman Exeter" Log in to reply |
Forthcoming Timetables 02/05/2023 at 23:18 #151651 | |
Benjwri
11 posts |
Sam Tugwell in post 151650 said:
Yeah I'm aware, I haven't looked at the planned timings for May there yet, but will make a decision to get around it when I reach that timetable. In other news I have completed timetabling the timetable for the Nuneham Blockade, providing a bit of a different experience of Oxford. If anyone would like to help test let me know! Log in to reply |
Forthcoming Timetables 03/05/2023 at 06:30 #151652 | |
Sam Tugwell
494 posts |
I wrote and eventually abandoned a winter 2021 timetable when the service was only 2 hourly and everything ran around 10-15 minutes late each way on the Okehampton section. It was only slightly manageable because of the long turnaround times at Okehampton. Now that the service is hourly with 10 minute turnarounds at Okehampton and, more importantly, the two trains cross at Crediton, I suspect you’ll find the Cowley Bridge - - Crediton single line to be unworkable.
"Signalman Exeter" Log in to reply |
Forthcoming Timetables 03/05/2023 at 10:01 #151653 | |
officer dibble
409 posts |
Sam Tugwell in post 151652 said:I wrote and eventually abandoned a winter 2021 timetable when the service was only 2 hourly and everything ran around 10-15 minutes late each way on the Okehampton section. It was only slightly manageable because of the long turnaround times at Okehampton. Now that the service is hourly with 10 minute turnarounds at Okehampton and, more importantly, the two trains cross at Crediton, I suspect you’ll find the Cowley Bridge - - Crediton single line to be unworkable. I was looking at doing a Exeter Summer 2023 TT. I ran a test train with a Class 150. I found that if you TT an Okehampton train to Yeoford (and send onto the Okehampton line) and give it +/- 8 minutes from Crediton it seems to work satisfactorily. That way you can start the Okehampton from Yeoford and it will pick up the timings from Crediton and not cause any delay when joining the ML at Cowley Bridge Junction. When in doubt - Contingency plan 2A. Someone didn't buy the milk - 2A. Someone sneezed at Swansea - 2A. A driver complains the cab is too cold - 2A. Unable to operate a HEx service 4 vice 8 - 2A. Points failure at Ipswich - 2A. Landslip at Pitlochry - 2A Log in to reply The following user said thank you: tigermatt |
Forthcoming Timetables 05/05/2023 at 17:28 #151690 | |
HST125Scorton
1191 posts |
A little update from myself. The WCML chain timetables are progressing quite well. I’m now up to Watford Jn with only Wembley ML left to do. Meanwhile I have also created 3 new timetables for the Crewe Simulation, based after the timetable change on random weekday, random Saturday & Sunday. Crewe PSB Weekday 2023 - Based on a Thursday during July. Crewe PSB Saturday 2023 - Based on a random Saturday in August. Crewe PSB Sunday 2023 - Based on a random Sunday in September. Aaron (AJRO) | Timetable Writer Last edited: 05/05/2023 at 17:29 by HST125Scorton Reason: None given Log in to reply The following user said thank you: TayViation |
Forthcoming Timetables 15/05/2023 at 14:28 #151852 | |
HST125Scorton
1191 posts |
A update from myself into where I an. The WCML Chain is nearly complete with work starting now on Wembley ML. Freight services will be added in once all the ECS/Passenger workings are complete. Freight will be from a selected date during June for what ran. Also more new timetables for Crewe PSB are in the works Crewe PSB Pre-Covid 2020 - Based on a Wednesday during February. Crewe PSB UK Lockdown One 2020 - Based on a random weekday during April with the First UK Lockdown due to Covid-19 with essential travel in force. Crewe PSB UK Lockdown Two 2020 - Based on a random weekday during November under the Second UK Lockdown due to Covid-19. Aaron (AJRO) | Timetable Writer Log in to reply The following user said thank you: i26 |
Forthcoming Timetables 16/05/2023 at 20:08 #151860 | |
Benjwri
11 posts |
An update from me on the timetables I am currently working on for the GWR network: Oxford Nuneham Blockade: Released May 2023: Westbury - Done, awaiting unit assignments Swansea - Done, awaiting unit assignments Sailsbury - Done, awaiting unit assignments Plymouth - In progress (All the above are waiting for the diagrams from RTT once the May timetable starts, and will be completed and released in the above order) Last edited: 16/05/2023 at 20:08 by Benjwri Reason: None given Log in to reply |
Forthcoming Timetables 03/06/2023 at 10:32 #152044 | |
DaveHarries
1285 posts |
officer dibble in post 19094 said:Well, I had a monumental Laptop failure a while back, and lost the lot. Which was a shame, as I had completed 99% of it and was working through the engineering moves.Commiserations. I know the irritation of the loss of things from one's PC. In terms of SimSig TTs the ones I start are all backed up to my cloud drive as well as being saved on my PC. I would have looked forward to that TT for Bristol, which is my home sim. And that makes me wonder what the progress is on Bristol sim. Dave Last edited: 03/06/2023 at 10:33 by DaveHarries Reason: None given Log in to reply |
Forthcoming Timetables 03/06/2023 at 11:03 #152046 | |
JamesN
1608 posts |
DaveHarries in post 152044 said:I suspect given the age of the post you are quoting, the timetable was probably for the old Bristol sim… Log in to reply |
Forthcoming Timetables 09/07/2023 at 13:06 #152323 | |
BenWright
195 posts |
Edge Hill 19th January 2023 timetable has been tested and is now posted (awaiting mod approval). I really hope you enjoy it
Log in to reply The following user said thank you: andyallen4014 |
Forthcoming Timetables 10/07/2023 at 09:11 #152326 | |
BenWright
195 posts |
Timetable out now https://www.SimSig.co.uk/File/Details/2914
Log in to reply |
Forthcoming Timetables 11/07/2023 at 08:04 #152340 | |
bazzmund
21 posts |
I'm working on '82 for South Humberside at the moment
Log in to reply |
Forthcoming Timetables 11/07/2023 at 13:58 #152347 | |
bugsy
1766 posts |
bazzmund in post 152340 said:I'm working on '82 for South Humberside at the momentGreat stuff. Look forward to it Everything that you make will be useful - providing it's made of chocolate. Log in to reply |
Forthcoming Timetables 11/07/2023 at 16:24 #152355 | |
HST125Scorton
1191 posts |
I'll be taking some time away creating new timetables for the community. This is due to myself having an operation at the end of this month and will require a few weeks of recovery. Everything on WCML Chain is complete passenger wise. I have all the details to add all the freight in, only Crewe & Staffordshire is done on that matter. I have new timetables been tested for Carlisle and Manchester Piccadilly I'll get them out as soon as I can. As for the stack of completed Crewe timetables these will out after the next Sim Update for it to allow Crew Changes at NH10/12. Aaron (AJRO) | Timetable Writer Log in to reply The following users said thank you: Champs450007, moonraker |
Forthcoming Timetables 12/07/2023 at 18:59 #152364 | |
bfcmik
100 posts |
Good luck with your operation and recovery, HST125