You are here: Home > Files > User-contributed > Timetables > Peterborough > File Details - Peterborough Summer 2020 MF Timetable
This is my timetable for Peterborough, an arbitrary weekday around June or so. Some freight has been kept from an older timetable in the early hours of the night to make the timetable more interesting, and overall freight is based off of November 2020. This timetable chains with the King's Cross - Summer 2020 MF timetable. To note is that the timetable is effectively run with three platform closures because those were not included in the simulation version 4.1.4, which this timetable is compatible with. The simulation should be run with the Spalding bi-di era selected, which is the suggested setting by the timetable.
Known issues:
1. Early morning Thameslink trains coming from Hitchin on the Down Slow before 08:30 have Arlesey moved to after Connington South in the timetable. The workaround for this is to choose "Run train to another timetable" after they depart Huntingdon and set next location to Peterborough.
2. ARS sometimes makes poor regulation decisions, especially regarding trains crossing over the paths of other trains, as is the norm for it.
Download | Edit | Back to List