Page 1 of 1
Bug: ARS sub-area BTN3 (Brighton) re-enables itself 01/12/2020 at 22:41 #134309 | |
belly buster
368 posts |
Easily reproducible; use the 2019 TT with a 14:00 seed. Disable the BTN3 sub-area and let 1A24 draw up to the buffers. At about 14:04 the BTN3 sub-areas enables itself without intervention.
Log in to reply |
Bug: ARS sub-area BTN3 (Brighton) re-enables itself 02/12/2020 at 04:25 #134314 | |
y10g9
895 posts |
Cheers Belly Buster. This has been previously logged on Mantis 28318 Log in to reply The following user said thank you: haydenrobertson |
Bug: ARS sub-area BTN3 (Brighton) re-enables itself 02/12/2020 at 07:23 #134316 | |
Peter Bennet
5400 posts |
I've had a look at the data file and there it is explicitly coded to do that in very specific circumstances. Why I don't know but it's certainly intentional. Peter I identify as half man half biscuit - crumbs! Log in to reply |
Bug: ARS sub-area BTN3 (Brighton) re-enables itself 02/12/2020 at 18:41 #134340 | |
GeoffM
6370 posts |
It's there to allow Brighton (P3) to run automatically even if a 12-car comes in to P3 and does not release the route (since it never fully passes the intermediate signal). The logic will pull the intermediate signal which disables the subarea, hence the automatic re-enabling. Part of this is mentioned in the manual.
SimSig Boss Last edited: 02/12/2020 at 18:44 by GeoffM Reason: None given Log in to reply The following user said thank you: Meld |
Bug: ARS sub-area BTN3 (Brighton) re-enables itself 02/12/2020 at 22:45 #134348 | |
belly buster
368 posts |
Maybe the re-enabling could be bypassed if the sub-area is collared?
Log in to reply |
Bug: ARS sub-area BTN3 (Brighton) re-enables itself 03/12/2020 at 06:52 #134352 | |
Jan
904 posts |
Could the logic check the state of the ARS button immediately before cancelling the route, save it and then, once the route has been cancelled, restore ARS only if it was actually enabled beforehand? Or are there some limitations to Simsig which would make that impractical to implement?
Two million people attempt to use Birmingham's magnificent rail network every year, with just over a million of them managing to get further than Smethwick. Log in to reply |
Bug: ARS sub-area BTN3 (Brighton) re-enables itself 03/12/2020 at 08:00 #134353 | |
clive
2781 posts |
Jan in post 134352 said:Could the logic check the state of the ARS button immediately before cancelling the route, save it and then, once the route has been cancelled, restore ARS only if it was actually enabled beforehand? Or are there some limitations to Simsig which would make that impractical to implement?I can't think of anything that would make it difficult, let along impractical. I'll add a note to the Mantis entry. Log in to reply |