Page 1 of 1
Jurgens crossing showing as permantly closed but has never been closed permantly (LTS) 14/10/2022 at 15:29 #148364 | |
Alarmkid23
5 posts |
(Network rail LC manager [For Essex]) has never heard of this being closed, so i believe by the simulation saying crossing clear Permanently at Jurgens (MCB) it appears to be Incorrect. And needs rectifying. Kind regards Gabriel Log in to reply |
Jurgens crossing showing as permantly closed but has never been closed permantly (LTS) 14/10/2022 at 15:30 #148365 | |
Alarmkid23
5 posts |
[quote=Alarmkid23;post=148364](Network rail LC manager [For Essex]) has never heard of this being closed, so i believe by the simulation saying crossing clear Permanently at Jurgens (MCB) it appears to be Incorrect. And needs rectifying. Kind regards Gabriel LTS route sim Log in to reply |
Jurgens crossing showing as permantly closed but has never been closed permantly (LTS) 14/10/2022 at 15:45 #148367 | |
9pN1SEAp
1180 posts |
I discussed this before here, it would appear to be a fully-manned MCB (at least during the day).
Jamie S (JAMS) Log in to reply |