Upcoming Games

(UTC times)


Full list
Add a game

Upcoming Events

No events to display

Peterborough 2009-10-15 SX

You are here: Home > Forum > General > General questions, comments, and issues > Peterborough 2009-10-15 SX

Page 1 of 1

Peterborough 2009-10-15 SX 24/10/2022 at 12:49 #148448
Feaquoy
Avatar
6 posts
Came across a problem when trains routed via Flyash line at Peterborough are overlength for this section of line. Specifically the line is 335m and two trains, 6M78 is 342m and 4D56 is 384m which if allowed to enter effectively blocks the surrounding routes. Is this a known problem and is there a fix?

Thanks!

Log in to reply
Peterborough 2009-10-15 SX 25/10/2022 at 09:17 #148457
Meld
Avatar
1111 posts
Both trains have the wrong length. 6M78 is the wrong stock type as well.

When Doncaster Station is released updated TTs will be available at the same time

Passed the age to be doing 'Spoon Feeding' !!!
Log in to reply
The following user said thank you: Feaquoy