Upcoming Games

(UTC times)


Full list
Add a game

Upcoming Events

No events to display

Forthcoming Timetables

You are here: Home > Forum > General > Timetabling > Forthcoming Timetables

Page 31 of 31

Forthcoming Timetables 05/06/2024 at 19:37 #156482
mfloyd
Avatar
187 posts
Many congratulations! 👶
Ripley, Derbyshire
Log in to reply
The following user said thank you: HST125Scorton
Forthcoming Timetables 26/06/2024 at 13:58 #157679
BenWright
Avatar
182 posts
Work has started on a timetable for Edge Hill based on 24th June 2024
Log in to reply
The following user said thank you: HST125Scorton
Forthcoming Timetables 29/06/2024 at 12:49 #157703
HST125Scorton
Avatar
1176 posts
Online
Just a little update. We both went for our first baby scan yesterday (28/06). It was so strange to see our little one but the baby is healthy and everything is all good. We are just over the 11 week mark so finds me a little more time of around a month to continue with timetables.

Easter at Crewe:
Day 2 of this timetable is now completed with a few amendments needed. I'll be progressing on Day 3 shortly.

Late Bank Holiday at Staffordshire & Crewe:
Both of these timetables are complete and will be tested after the above.

In Writing:
After speaking with Alex (Ajax) I have decided to make another WCML Timetable on the Wembley Mainlines simulation. Now this is very early stages and based on a Sunday until I get my head around the weekday and Saturday timetables. I will aim to try and have it out before Xmas if not it may be delayed a little more.

48hr Carlisle based on Friday 20th & Saturday 21st September 2024 for the ECML Diversions.

Three Man Piccadilly for a weekday (SX), Saturday (SO) & Sunday (SunO). These timetables are based on current WTTs for December. There will be non of this 'P-Code' business.
Three Warrington PSB for a weekday (SX), Saturday (SO) & Sunday (SunO). These timetables are based on current WTTs for December. There will be non of this 'P-Code' business.

I'm still in minds whether to make a Man Piccadilly timetable based on the August Bank Holiday weekend this will most likely be on the Saturday. Any ideas about this I'll post up closer to time.


Completed Ready for Upload:
Rugby Centre - Winter 2021, This one will be uploaded once an update is provided to fix the issue at Northampton P1.
Man Piccadilly - Wednesday 14th February
Man Piccadilly - Saturday 17th February

Aaron (AJRO) | Timetable Writer
Last edited: 29/06/2024 at 14:43 by HST125Scorton
Reason: None given

Log in to reply
Forthcoming Timetables 12/07/2024 at 09:19 #157807
bazzmund
Avatar
21 posts
'82 South Humberside has all passenger diagrams as well as a few freight workings including a full 24 hours worth of ore diagrams. Been on the back burner for a while due to moving house but I will be picking it back up.

I also have plans for a '79 Waterloo

Log in to reply
The following users said thank you: simonroberts755, whatlep
Forthcoming Timetables 06/08/2024 at 12:11 #158069
HST125Scorton
Avatar
1176 posts
Online
Planning is is place for a York Autumn 2024 SX timetable this will be based on 4th September. Everything on this timetable will be what ran on that day for freight & passenger flows. As an added extras I will include the Scarborough Spa Express charter (Final one in August for this year) and RHTT shakedown runs (These start in October). All this will be done from the 'Sidings Hotel' outside of York overlooking the ECML.

Requests have come along for both Huddersfield and Stockport. With the changing face regarding the TRU (TransPennine route Update) Huddersfield will be come a little mission but as always this won't stop me to much. Stockport on the other hand is based on the final Wednesday before the December timetable change overs and fully based on WTTs using LTPs.

Aaron (AJRO) | Timetable Writer
Log in to reply
Forthcoming Timetables 12/08/2024 at 17:46 #158151
apache668
Avatar
30 posts
Just pulled the datasets for Salisbury and Basingstoke for 2024 Summer Sundays. Once complete will move onto Weekdays.
Basically... What it is driver... We uh....
Log in to reply
Forthcoming Timetables 08/09/2024 at 22:05 #158463
bill_gensheet
Avatar
1370 posts
Having done a Walsall 1975 SAT to chain to Wolverhampton, I'm now doing a Telford/Oxley timetable to give all 3 chained.
Needing a bit more inventiveness on the freight side as the sim is the 2006+ layout.

Bill

Log in to reply
The following user said thank you: sunocske
Forthcoming Timetables 14/09/2024 at 06:52 #158513
Giantray
Avatar
344 posts
Thinking of compiling a 1991 LondonBridge ASC timetable, would there be much interest in this?
Professionalism mean nothing around a bunch of Amatuer wannabees!
Log in to reply
The following users said thank you: bri2808, broodje, traindriver17
Forthcoming Timetables 14/09/2024 at 06:58 #158514
JamesN
Avatar
1595 posts
Online
Giantray in post 158513 said:
Thinking of compiling a 1991 LondonBridge ASC timetable, would there be much interest in this?
Absolutely!

Last edited: 14/09/2024 at 06:58 by JamesN
Reason: None given

Log in to reply
Forthcoming Timetables 14/09/2024 at 08:12 #158518
traindriver17
Avatar
36 posts
yes please! 1991 Elmers End to Addiscombe still operating.Could that be included?
Last edited: 14/09/2024 at 09:47 by traindriver17
Reason: None given

Log in to reply
Forthcoming Timetables 14/09/2024 at 09:56 #158520
58050
Avatar
2655 posts
My Wolverhampton summer 1990 TT has had a significant upgrade partly due to me writing a Stafford summer 1990 TT & coming across a number of additional services that head off towards Wolverhampton. Testing has started this weekend on Wolverhampton & testing should start on Monday of Stafford. Then I'll carry out a chain test between Stafford & Wolverhampton. Once that goes through OK both TTs will be submmitted for release together at the same time. This now mean some additional services on my Birmingham New Street summer 1990 TT & a complete re-vamp with the Coventry summer 1990 TT. Further to this I intend for 2025 to write a Saltley summer 1990 TT to chain to Birmingham New Street & all 5 West Midlands sims will chain together with this summer 1990 TT. For those of you wondering why I've said 2025 for Saltley, that's because once Wolverhampton & Stafford are released I intend to finish off my Crewe summer 1988 TT before starting on the Saltley TT & that in itself my take a month or 2 to get done which if all goes well Crewe could be ready to go around christmas following testing.
Log in to reply
The following users said thank you: traindriver17, broodje, sunocske, postal, mldaureol
Forthcoming Timetables 14/09/2024 at 12:04 #158524
traindriver17
Avatar
36 posts
Looking forward to 88 Crewe TT always prefer the 80/90 TT's
Log in to reply
Forthcoming Timetables Yesterday at 08:34 #158552
Giantray
Avatar
344 posts
traindriver17 in post 158518 said:
yes please! 1991 Elmers End to Addiscombe still operating.Could that be included?
Slight problem with that. The Elmers End to Addiscombe Branch is not in any Simsig London Bridge ASC era. Had the London Bridge ASC Simsig included the late 1970s era, Addiscombe, Woodside, Bricklayers Arms, New Cross Gate Carriage Sidings, Platform 7 London Bridge, Cannon Street 8 vice 7 platforms, Borough Market Jcn up crossover, it would be simple, but they are missing in the 2000 version. I will probably do a London Bridge ASC Mini SimSig timetable first and go from there. I did a 1982 timetable for the mini sim and that required a lot of work getting Cannon Street to work, plus the discovery of some shunt moves that didn't work in Simsig. But it is only a game so accuracy of the timetable only needs to represent the workings of the era depicted, doesn't have to be identical.

Professionalism mean nothing around a bunch of Amatuer wannabees!
Last edited: Yesterday at 08:35 by Giantray
Reason: None given

Log in to reply
Forthcoming Timetables Yesterday at 10:13 #158554
bill_gensheet
Avatar
1370 posts
Giantray in post 158552 said:
traindriver17 in post 158518 said:
yes please! 1991 Elmers End to Addiscombe still operating.Could that be included?
Slight problem with that. The Elmers End to Addiscombe Branch is not in any Simsig London Bridge ASC era.
Had similar thoughts on old TT for LBG, but more considering half the timetable (SC or SE) for the full sim.

I was going to suggest losing the Addiscombes into New Beckenham Down sidings - but while there's an exit doesn't look like there is an entry listed in the timetabler. Bug ?

Log in to reply
Forthcoming Timetables Yesterday at 11:41 #158556
broodje
Avatar
182 posts
Online
I do have a draft of a 1978 summer TT, but it is from Kurt S. I'm not sure if I have his current email address somewhere, to ask if his version may be shared. At the time (talking 2008 here!) it was already quite playable on his version of London bridge, but that did include a 70sh (as build) mode. The WTT has 1300 trains, but also 1032 invalid timetable data entries. So it could use some polishing ;).
Log in to reply