Page 1 of 1
Readback incomplete on Parkandillack staff 13/10/2024 at 12:50 #158826 | |
rfw
177 posts |
When a train is going from Parkandillack to & exiting at Burngullow Clay Sidings and the train arrives at Burngullow, leaving the single line section, the phone call from the shunter to the signaller has the train ID in the message, but in the readback of the reply the train ID is missing. Post has attachments. Log in to view them. The train now standing on platform 2, should be on the rails Log in to reply |
Readback incomplete on Parkandillack staff 13/10/2024 at 14:11 #158830 | |
eps125
145 posts |
rfw in post 158826 said:When a train is going from Parkandillack to & exiting at Burngullow Clay Sidings and the train arrives at Burngullow, leaving the single line section, the phone call from the shunter to the signaller has the train ID in the message, but in the readback of the reply the train ID is missing.Mantis 41531 to add the headcode of the train in the reply. Log in to reply |