Upcoming Games

(UTC times)


Full list
Add a game

Upcoming Events

No events to display

Who's Online

Person82, waucott, Hap, Meld, Galatea45699 (5 users seen recently)

LU sleet trains

You are here: Home > Forum > Simulations > Released > Wembley Suburban > LU sleet trains

Page 1 of 1

LU sleet trains 22/10/2011 at 16:49 #21959
jc92
Avatar
3685 posts
just a quick question- they appear in the bakerloo WTT- what are sleet trains?
"We don't stop camborne wednesdays"
Log in to reply
Re: LU sleet trains 22/10/2011 at 17:09 #21960
headshot119
Avatar
4869 posts
From memory they are deicer trains, they have brushes on them that basically coat the juice rails in deicer.

Steve McSherry or UKTM probably could tell you more.

"Passengers for New Lane, should be seated in the rear coach of the train " - Opinions are my own and not those of my employer
Log in to reply
The following user said thank you: jc92
Re: LU sleet trains 23/10/2011 at 17:47 #21989
metcontrol
Avatar
227 posts
They are normal passenger trains, which have de-icing equipment fitted. The brushes are used to sweep ice, and a nozzle is used to spray the fluid.
Certain train paths are allocated as being required as "De-icing" trains, and generally what this gives (particularly on a line like the Met) is an even allocation of trains carrying out de-icing over the whole line / all branches. It also means you have a few equipped trains out-stabled at various sidings overnight - this helps with early morning de-icing should the need arise.

The "sleets" are run dependant on the weather forecast - and there a several "tactical" ways in which we deal with keeping things moving. They range from running trains with the "de-icing" switched on from, say 1900hrs until end of traffic, or running additional "sleet trains" overnight if there is a severe risk from freezing conditions.

Years ago we did have a fleet of "sleet" locomotives built for the task, instead of having passenger trains equipped, but they no longer exist.

Log in to reply
The following users said thank you: jc92, sunocske
Re: LU sleet trains 24/10/2011 at 07:53 #21996
moonraker
Avatar
370 posts
Were any of the Metropolitan Vickers locos used for this purpose ie "Sarah Siddons" ?
Log in to reply
Re: LU sleet trains 25/10/2011 at 10:42 #22025
bubblegut
Avatar
15 posts
I believe that Sarah Siddons and Thomas Lord were mainly used for engineering such as pulling ballast wagons.

When steam finished on the Met they fitted de-icing boxes into the power rails and the fluid was spread by the shoes.

Last edited: 25/10/2011 at 10:45 by bubblegut
Log in to reply