Upcoming Games

No games to display

Full list
Add a game

Upcoming Events

No events to display

Who's Online

Meld, simonroberts755, Kage, Person82, zandoodle, andi, eps125 (7 users seen recently)

maltby colliery south errors/points

You are here: Home > Forum > Simulations > Released > Worksop > maltby colliery south errors/points

Page 1 of 1

maltby colliery south errors/points 15/05/2011 at 20:19 #3041
jc92
Avatar
3701 posts
hi all
i spoke in depth with my freind whos a signaller at maltby colliery south box and was explaining about the boxes working on SimSig.

a few points that came up were:

1.if a route is set from M10 to M2 (colliery to SB), m33 cannot be cleared for the single line to M34 although this is more than possible in real life and occurs when a through train passes a train propelling out of the colliery. so why is this interlocking present?

2. box special instructions (and general passing loop procedures) mean that if a train is routed onto the single line or the passing loop in one direction, the train in the other direction must wait until this train is stationary before being allowed to proceed. eg if a train was routed M36-M8 to be held in the loop, a train cant proceed past M33 until this train is stationary (the SimSig equivelant would i guess be a timeout). this interlocking isnt present although it does appear on other sims eg exeter.

3. the approach TCs for signals M36 and M33 lock the said signals on a 2min timeout when occupied (therefore the signaller usually pulls off before this when warned, i think by a treadle. if not then its a case of waiting for the 2min release

4. the loop lengths could do with extension. although portrayed accurately (385m for the main and about 415m for the passing loop), this doesnt allow for run rounds on full 399m trains as in real life as when the loco reataches it hangs over the TC. the actual procedure for fixing this is that the train, when cleared for a runround, draws forward so the first wagon is in line with the signal, it then uncouples and runs round. reasonably this isnt possible in SimSig but extending the loops by 20m would fix this. (technically, TT creators shortening trains would fix this too.

just a few points for comments, critisism and/or consideration

"We don't stop camborne wednesdays"
Log in to reply
maltby colliery south errors/points 15/05/2011 at 20:19 #15847
jc92
Avatar
3701 posts
hi all
i spoke in depth with my freind whos a signaller at maltby colliery south box and was explaining about the boxes working on SimSig.

a few points that came up were:

1.if a route is set from M10 to M2 (colliery to SB), m33 cannot be cleared for the single line to M34 although this is more than possible in real life and occurs when a through train passes a train propelling out of the colliery. so why is this interlocking present?

2. box special instructions (and general passing loop procedures) mean that if a train is routed onto the single line or the passing loop in one direction, the train in the other direction must wait until this train is stationary before being allowed to proceed. eg if a train was routed M36-M8 to be held in the loop, a train cant proceed past M33 until this train is stationary (the SimSig equivelant would i guess be a timeout). this interlocking isnt present although it does appear on other sims eg exeter.

3. the approach TCs for signals M36 and M33 lock the said signals on a 2min timeout when occupied (therefore the signaller usually pulls off before this when warned, i think by a treadle. if not then its a case of waiting for the 2min release

4. the loop lengths could do with extension. although portrayed accurately (385m for the main and about 415m for the passing loop), this doesnt allow for run rounds on full 399m trains as in real life as when the loco reataches it hangs over the TC. the actual procedure for fixing this is that the train, when cleared for a runround, draws forward so the first wagon is in line with the signal, it then uncouples and runs round. reasonably this isnt possible in SimSig but extending the loops by 20m would fix this. (technically, TT creators shortening trains would fix this too.

just a few points for comments, critisism and/or consideration

"We don't stop camborne wednesdays"
Log in to reply
maltby colliery south errors/points 22/05/2011 at 11:27 #15959
Freightman
Avatar
5 posts
Had lots of fun with Maltby. Running the 2000 setup and can only get trains to come out of location 'Maltby Colliery' then 'Maltby (SB)' - 'Maltby Down Loop', departures from 'Maltby FHH' wouldn't appear and the timetable editor won't accept the route 'Maltby FHH-Maltby (SB)-Maltby Down Loop'. Both the down loop and arr/dep loop appear to be location 'Maltby Down Loop'. Propelling out of the Colliery into the down loop(not the arr/dep) and set to N0 I've run round a train of 394m including loco.

Thanks for the Sim, Freightman likes Worksop and is already doing unpleasant things to the timetable, currently have one up plus two down trains heading for Maltby plus another due out of the colliery to run round!

Graham

Log in to reply
Re: maltby colliery south errors/points 11/01/2012 at 19:52 #27112
jc92
Avatar
3701 posts
attached is a mockup of the SYJR revised for the period post 1983 when maltby colliery north, firbeck A and B, and harworth boxes closed, putting control over to maltby colliery south, but prior to dinnington colliery junctions closure in 1997.
Post has attachments. Log in to view them.
"We don't stop camborne wednesdays"
Log in to reply
Re: maltby colliery south errors/points 06/11/2014 at 00:32 #65478
uboat
Avatar
219 posts
is it possible for someone to add Maltby loop lengths to the manual?
Log in to reply
maltby colliery south errors/points 06/11/2014 at 13:39 #65482
Steamer
Avatar
3997 posts
Done.
"Don't stress/ relax/ let life roll off your backs./ Except for death and paying taxes/ everything in life.../ is only for now." (Avenue Q)
Log in to reply
The following users said thank you: BarryM, uboat, LordSven