Saltley 2013 Sunday WTT 04/04/2013 at 19:38 #43060
Steamer
Avatar
3984 posts
Submitted to the download area, awaiting moderator approval.

TT Notes:


A Sunday timetable for the Saltley area, which is less much busy than the weekday timetable. Passsenger times are taken from Open Train Times, freight times from Network Rail's WTT published online. Please leave comments below, as if this TT is popular I might write similar timetables for other large simulations. As ever, feel free to post any bugs or questions below and I'll do my best to resolve them.

Cross Country

Cross Country services are largely unchanged on a Sunday, however it will be after midday before they reach normal intensity.

London Midland

On the Cross City line (South Top panel), services are reduced to a half-hourly Redditch service, with no trains terminating at Longbridge. Hereford services are halved to two-hourly for most of the day. Note that these trains, dispite running as class 1, follow the stoppers into New Street.
On the South Bottom panel, there is an hourly service to Stratford and Dorridge from Galton Bridge, and no trains terminate at Shirley.

Chiltern
Chiltern operate a half hourly service to London, and a two-hourly service to Stratford. Because this simulation does not contain the remodelled Moor Street, services that terminate there continue to Snow Hill turnback siding, where they reverse and return to Moor Street to form the return working after the Dorridge service has passed. For the same reason, trains which stable overnight at Moor Street leave and enter via Caledonia Yard, except the ECS to Stratford, which enters at Tyseley South.

West Coast Railways
WCR operate two return steam hauled services between Snow Hill and Stratford, with the loco running round at each end. A fictional shunt has had to be made at Stratford, as the layout has been remodelled since the data for this simulation was taken.

Freight
Being a Sunday, there is very little freight traffic. Almost all of what does run runs in the evening, with the exception of the one freight train which is booked through New Street, which passes through at about half ten. Note that this train should be held until it's correct departure time, and that it will re-enter at Five Ways as soon as it leaves the simulation at New Street.

Enjoy!
"Don't stress/ relax/ let life roll off your backs./ Except for death and paying taxes/ everything in life.../ is only for now." (Avenue Q)
Last edited: 05/04/2013 at 08:28 by Steamer
Log in to reply
The following users said thank you: BarryM, Richard42, John
Saltley 2013 Sunday WTT 05/04/2013 at 08:26 #43078
Steamer
Avatar
3984 posts
Now approved, and available here.
"Don't stress/ relax/ let life roll off your backs./ Except for death and paying taxes/ everything in life.../ is only for now." (Avenue Q)
Last edited: 05/04/2013 at 08:27 by Steamer
Log in to reply
The following users said thank you: MikeW, Sidestick Priority
Saltley 2013 Sunday WTT 05/04/2013 at 11:33 #43088
moonraker
Avatar
370 posts
Online
Steamer - I note that all the Chiltern Units ECS to Moor Street and Snow Hill come from Caledonia Yard. From experience of having signed Tyseley whilst still a driver I would've said that anything ECS for the Snow Hill area would just come out of the North End departure line to be honest. Caledonia Yard is not AFAIK used to stable any units. I know the layout has changed since then though
Last edited: 05/04/2013 at 12:32 by moonraker
Log in to reply
Saltley 2013 Sunday WTT 05/04/2013 at 13:10 #43091
Steamer
Avatar
3984 posts
" said:
Steamer - I note that all the Chiltern Units ECS to Moor Street and Snow Hill come from Caledonia Yard. From experience of having signed Tyseley whilst still a driver I would've said that anything ECS for the Snow Hill area would just come out of the North End departure line to be honest. Caledonia Yard is not AFAIK used to stable any units. I know the layout has changed since then though
From what I could deduce from Open Train Times, Chiltern units are all stabled in sidings/bays at Moor Street, which are not simulated. I decided to use Caledonia Yard as it was the nearest entry point, and to add some interest to the TT.

"Don't stress/ relax/ let life roll off your backs./ Except for death and paying taxes/ everything in life.../ is only for now." (Avenue Q)
Log in to reply
Saltley 2013 Sunday WTT 05/04/2013 at 14:16 #43095
moonraker
Avatar
370 posts
Online
Fair enough. I remember most of the Chiltern sets stabling in the sidings at Tyseley nearest the Bordesley Lines (Saint Andrews Junction) side when we used to go there with a turbo or 158. That was 2001
Log in to reply
Saltley 2013 Sunday WTT 10/04/2013 at 09:22 #43264
Richard42
Avatar
45 posts
Thanks very much for this new timetable. I used to run the other Saltley timetables from midnight single-handed but usually got overwhelmed around sim 'breakfast time' when the passenger services started in earnest. I'm about half-way through this Sunday timetable for the first time and it seems to be just nicely do-able. I, for one, would one day love similar timetables for some of the other big sims (as per your suggestion!).
Log in to reply
Saltley 2013 Sunday WTT 09/04/2015 at 08:00 #70913
Steamer
Avatar
3984 posts
This timetable has now been updated to work with the Loader version of the simulation. The new file can be downloaded here.
"Don't stress/ relax/ let life roll off your backs./ Except for death and paying taxes/ everything in life.../ is only for now." (Avenue Q)