Upcoming Games

(UTC times)


Full list
Add a game

Upcoming Events

No events to display

Who's Online

Jsun, postal, Person82, waucott (4 users seen recently)

Y201

You are here: Home > Forum > Simulations > Released > York North/South > Y201

Page 1 of 1

Y201 23/06/2016 at 19:04 #83172
6691donn
Avatar
9 posts
I could be wrong so dont shot me down straight away but Y201 controls movements from Down Leeds to Holgate sidings and also the Down Leeds.
Now in the Sim its not approach controlled however I believe that it is. Having signed the route you go from a line speed of 60mph down to 25mph with no warning boards.

Is this a bug??

More of a player then a poster. TPD
Log in to reply
Y201 23/06/2016 at 20:27 #83173
GeoffM
Avatar
6376 posts
Looks like it, will verify the correct conditions shortly. Mantis 15444.
SimSig Boss
Log in to reply
The following user said thank you: 6691donn
Y201 30/06/2016 at 12:25 #83307
Chrisrail
Avatar
384 posts
Y201 is only approach controlled if the route is set into Holgate Loop / Sidings. Spoken with York SSM today
Log in to reply