Upcoming Games

(UTC times)


Full list
Add a game

Upcoming Events

No events to display

Who's Online

Person82, waucott, Hap, Meld, Galatea45699 (5 users seen recently)

Development News

You are here: Home > Forum > Announcements > Permanent announcements > Development News

Page 3 of 3

Development News 05/01/2022 at 07:00 #143351
headshot119
Avatar
4869 posts
lazzer in post 143346 said:
I just had a thought. I assume the recent complete remodelling of Bristol East Junction will not be implemented in the new Bristol sim?

Or are you changing your plans, in order to include it?
As it was a change made under TVSC, it's outside the scope of the Bristol PSB simulation.

"Passengers for New Lane, should be seated in the rear coach of the train " - Opinions are my own and not those of my employer
Log in to reply
Development News 05/01/2022 at 22:33 #143364
Guts
Avatar
604 posts
headshot119 in post 143351 said:
lazzer in post 143346 said:
I just had a thought. I assume the recent complete remodelling of Bristol East Junction will not be implemented in the new Bristol sim?

Or are you changing your plans, in order to include it?
As it was a change made under TVSC, it's outside the scope of the Bristol PSB simulation.
Can I ask what Era's will be included if the remodelling isn't being done? I'm interested either way, can't wait for it to be released.

Log in to reply
Development News 05/01/2022 at 23:10 #143366
elltrain3
Avatar
369 posts
"SimSig Bristol PSB will cover the PSB layout from 1977, through to early 2017 when it began to close in stages with migration of control to Thames Valley Signalling Centre (TVSC). It will also cover St Andrews Junction signal box, and Puxton gate box."

From Headshott on Page 1 of this thread, not sure how many era's within that time frame but all the "major" layout changes associated with DMU's etc would be included I suspect!

Resident Mock Maker! / "The Out Of Control Host"
Log in to reply
The following users said thank you: y10g9, Guts
Development News 06/01/2022 at 10:21 #143370
y10g9
Avatar
895 posts
Most of this has already been stated in this thread so I suggest people go back and reread the entire thread first, Especially any post made by headshot119 or pedroathome.

The current plan (which as always is subject to change) is looking currently at 3 or 4 eras. The oldest Era will have the original 4 track Filton bank from before it was lifted, with other eras being centred around various large remodelling's that occurred. EG parcels vs platforms 13&15 at Temple Meads, Bristol Parkway RMT platforms & P4, the various differing locations of Filton Junction/Filton Abbey Wood, and the Bulk Handling Terminal at St Andrews.

As stated above in the very first post of this forum thread, this is a simulation of Bristol PSB. Therefore the electrification works, and the re-quadrupling of the Filton Bank (and any other changes since) are not included as when these projects were completed, those areas were transferred across to the various workstations in TVSC (Thames Valley Signalling Centre located at Didcot).

While Bristol PSB still exists to this day, after the Bristol Area Signalling Renewals & Enhancement (BASRE) was carried out, most of the panel was recontroled into TVSC leaving only a small section of Panel A in the PSB. Bristol itself only controls from the fringe at Exeter near Cogload Junction to Flax Bourton (with Puxton Gate Box still surviving controlling Puxton and Huish Level Crossings). The remains of Panel A, and all of the other 3 panels were transferred.

Log in to reply
The following users said thank you: Guts, Newhampshires, Banners88, elltrain3
Development News 14/03/2022 at 17:05 #145723
Thomas Isherwood
Avatar
9 posts
Any update on the progress of the sim and any ETA?
Log in to reply