Upcoming Games

(UTC times)


Full list
Add a game

Upcoming Events

No events to display

Who's Online

Person82, 442s3, andi, 0D07, jem771, Terry, rodney30, StephenB2988 (8 users seen recently)

Great But Bewildering

You are here: Home > Forum > Simulations > Released > Carlisle > Great But Bewildering

Page 1 of 3

Great But Bewildering 24/08/2024 at 11:35 #158282
NorthernWarrior
Avatar
98 posts
Thought I would finally try my hand at this though sadly see it has just come off support.

Well acknowledging it's a fantastic freeware effort nevertheless it is rather overwhelming. Just so much going on, got trains stood everywhere while trying to fathom out the various attach and detach moves at Carlisle Citadel and associated light engine moves. Currently at about 0340 and seem to have "lost" 5T02 but 0T01 still looking for it so can't move it on to the next working (I will have to amend the timetable).

Feedback - well it would have helped if some locations in the area had a few liberties had been taken allowing headcode data to be retained, namely the non platform through roads at Citadel. Comparison has to be made with with the SIAM Carlisle 1973 traffic simulation, albeit everything is diesel on that one, where it seems easier to keep track of things and you have total control over use of traction so you can grab any shunter to hand rather than have to be 0T01, 0T02 etc.

Has anyone done a simplifier with the "diagram" for each of the station shunters and/or all the attach and attach moves?

Anyhow I will persevere but fear a few more train deletions might be necessary to restore order!

Vern
Log in to reply
Great But Bewildering 24/08/2024 at 11:49 #158283
postal
Avatar
5264 posts
NorthernWarrior in post 158282 said:
Thought I would finally try my hand at this though sadly see it has just come off support.

Well acknowledging it's a fantastic freeware effort nevertheless it is rather overwhelming. Just so much going on, got trains stood everywhere while trying to fathom out the various attach and detach moves at Carlisle Citadel and associated light engine moves. Currently at about 0340 and seem to have "lost" 5T02 but 0T01 still looking for it so can't move it on to the next working (I will have to amend the timetable).

Feedback - well it would have helped if some locations in the area had a few liberties had been taken allowing headcode data to be retained, namely the non platform through roads at Citadel. Comparison has to be made with with the SIAM Carlisle 1973 traffic simulation, albeit everything is diesel on that one, where it seems easier to keep track of things and you have total control over use of traction so you can grab any shunter to hand rather than have to be 0T01, 0T02 etc.

Has anyone done a simplifier with the "diagram" for each of the station shunters and/or all the attach and attach moves?

Anyhow I will persevere but fear a few more train deletions might be necessary to restore order!
Have you looked at the Manual for the simulation (https://www.SimSig.co.uk/Wiki/Show?page=simulations:carlisle)?

“In life, there is always someone out there, who won’t like you, for whatever reason, don’t let the insecurities in their lives affect yours.” – Rashida Rowe
Last edited: 24/08/2024 at 11:49 by postal
Reason: None given

Log in to reply
The following user said thank you: NorthernWarrior
Great But Bewildering 24/08/2024 at 12:23 #158285
flabberdacks
Avatar
636 posts
Good on you for having a go - that's arguably the hardest timetable in all of SimSig, with all the tight shunting moves, and how difficult it is to recover after you make an error.

You have some options to find out where 5T02 has got to. In your Train List (press F2), if a train matching that description is currently on the sim anywhere, it'll show in that list.

Failing that, in the F4 timetable screen (timetables tab), you can find out if that move was due to enter from a siding and hasn't yet, or, the 'Referenced by' button will help clue you in if it's meant to have divided from another train.

Personally I struggled with this timetable the first time I gave it ago, and we are not alone in this. It does take some practice, and you definitely need to develop and stick to a system of keeping track of where the shunts are using the scratch pad and maybe some sticky notes. Once I developed a system that worked for me, it got a lot easier. I imagine it was the same with the signallers who worked the box at the time.

Log in to reply
The following user said thank you: NorthernWarrior
Great But Bewildering 24/08/2024 at 14:43 #158290
NorthernWarrior
Avatar
98 posts
flabberdacks in post 158285 said:
Good on you for having a go - that's arguably the hardest timetable in all of SimSig, with all the tight shunting moves, and how difficult it is to recover after you make an error.

Thanks for that and postal too - yes have looked at the manual which helps a bit but unfortunately doesn't simplify the various shunt moves into a digestible form. I think this is one where practice will help and as I said it is remarkable for free when other lesser panels are payware.

Edit: I found 5T02, comes off the rear of 4M10 which is heavily delayed by yours truly north of Caldew!

Vern
Last edited: 24/08/2024 at 14:58 by NorthernWarrior
Reason: None given

Log in to reply
Great But Bewildering 24/08/2024 at 15:28 #158291
58050
Avatar
2659 posts
NorthernWarrior in post 158290 said:
flabberdacks in post 158285 said:
Good on you for having a go - that's arguably the hardest timetable in all of SimSig, with all the tight shunting moves, and how difficult it is to recover after you make an error.

Thanks for that and postal too - yes have looked at the manual which helps a bit but unfortunately doesn't simplify the various shunt moves into a digestible form. I think this is one where practice will help and as I said it is remarkable for free when other lesser panels are payware.

Edit: I found 5T02, comes off the rear of 4M10 which is heavily delayed by yours truly north of Caldew!
I wouldn't put yourself down cos your stuggling with this timetable, as Flabberdacks says 'good on you for having a go'. I wrote the timetable years ago & I haven't played it for several years, so if I was to have a go now on it I'd probably make as bad a job as you with it. The more times you run through it the easier it gets to a degree as you tend to remember certains things. The next timetable I write for Carlisle should be alot easier than this one.

Log in to reply
The following user said thank you: NorthernWarrior
Great But Bewildering 24/08/2024 at 19:15 #158296
mjkerr
Avatar
195 posts
NorthernWarrior in post 158282 said:
it seems easier to keep track of things and you have total control over use of traction so you can grab any shunter to hand rather than have to be 0T01, 0T02 etc.

Has anyone done a simplifier with the "diagram" for each of the station shunters and/or all the attach and attach moves?

Which year / timetable are you using?

I have created two timetables for personal use
These use four spreadsheets
I then print out the shunting one
As each shunting move is completed I tick it off
Some are simple A to B movements, or A to B to C movements
However some are combinations, wait for another train and then repeat
I know once I started the shunter reverse from P2 to P5 then realised afterwards it should have picked up the coaches and the entire simulation was borked thereafter as the Down Main was now blocked!

The headcodes are a necessary evil
It is easier with 0T01, 0T02, 0T03 and so on
When reading the Working Timetable I found several workings all with the same headcode for shunting
You could enter these as (for example) 0T01-1, 0T01-2, 0T01-3 and so on
However only the four digits for 0T01 are shown and it would be all to easy to not know which shunting movement is actually taking place

DELETED
Log in to reply
Great But Bewildering 24/08/2024 at 20:15 #158297
postal
Avatar
5264 posts
NorthernWarrior in post 158290 said:
. . . but unfortunately doesn't simplify the various shunt moves into a digestible form. . .
If you scroll down to the 1979 TT section there are links to PDF simplifiers for all of the shunt and trip workings in the TT along with a summary of all of the carriage shunts towards the foot of the section. Do those PDFs meet your needs?

“In life, there is always someone out there, who won’t like you, for whatever reason, don’t let the insecurities in their lives affect yours.” – Rashida Rowe
Last edited: 24/08/2024 at 20:15 by postal
Reason: None given

Log in to reply
The following user said thank you: NorthernWarrior
Great But Bewildering 25/08/2024 at 11:31 #158300
NorthernWarrior
Avatar
98 posts
Thanks, those pdf's should help immensely.

Think I might actually start over. Another mistake I made was trying to keep things going in 1:1 time rather than hitting the pause button to think the next moves through.

Right, here we go for Strike 2!

Vern
Log in to reply
Great But Bewildering 25/08/2024 at 18:00 #158305
flabberdacks
Avatar
636 posts
Good luck!

The feeling of everything becoming easier over time as you gain familiarity is remarkable

Log in to reply
Great But Bewildering 26/08/2024 at 09:31 #158309
trolleybus
Avatar
150 posts
This is one of my favourite sims. I assume you're usign the 1979 TT?
The rules are comprehensive and they strictly enforce things like a pilot not appearing until it's finished its previous task. I've had vey major disruption in the past and wondered why a 5T0x failed to appear but discovered after a little digging that it was still hours away, with many other workings needed before it could appear. It would be possible, though not easy, to rearrange the rules to change the order of light engine and ECS moves but I prefer to try to keep some sort of service going within the rules as set out.
My tip: be very careful to keep track of what's in the sidings, particularly the centre roads. I've been waiting ages for some stock only to realise it was ready to depart SB or SC and had been for some time. My other tip: come back to this timetable again, more than once. You gradually get to learn it, and there's quite a sense of satisfaction getting it right.
If you like this sim I'd recommend the BR-era Motherwell. It's of similar complexity, mainly in the Mossend area. It also has many of the same trains!
There's also the BR-era New Street. OK during the day, but very, very intense in the evening and small hours with all the parcels traffic. Lots of joins and splits, some very complex, with tight timings.

Log in to reply
The following users said thank you: flabberdacks, postal
Great But Bewildering 26/08/2024 at 11:17 #158310
lazzer
Avatar
634 posts
Although I use sticky notes for various things when playing Carlisle 79/80, I also use the station scratchpad, and I think a few others do this too. I've attached a screenshot of how mine looks at 02.37 in my current game.

The labels "-UP-" and "-DN-" in the far-right column are used to indicate which end of the road a certain train is in. So 5M10 is at the Up end of Siding B (and waiting for a joining train), while 5T02 is to its right, towards the Down end. Where space permits I have added the departure time for trains too (such as 0244 for 3S11 at the Down end of Siding A).

I have no idea why I've put "-FR-" in the empty column in the middle though LOL! I haven't played since July, but I'm sure there was a reason for it ...


Post has attachments. Log in to view them.
Last edited: 26/08/2024 at 12:33 by lazzer
Reason: None given

Log in to reply
Great But Bewildering 26/08/2024 at 14:26 #158312
postal
Avatar
5264 posts
It is Pascal's (58050) timetable but I spent a lot of time working with him on developing the shunt moves and pilot workings and several hundred hours of TT testing. I wouldn't want to put words in Pascal's mouth but I'm sure we both take a great deal of pride and pleasure in reading how many people do enjoy the challenge that the TT gives.
“In life, there is always someone out there, who won’t like you, for whatever reason, don’t let the insecurities in their lives affect yours.” – Rashida Rowe
Log in to reply
The following users said thank you: 58050, trolleybus
Great But Bewildering 26/08/2024 at 15:30 #158314
NorthernWarrior
Avatar
98 posts
Yes I've just done something similar with the station scratchpad and also got a text document open to Alt Tab to making any notes as I go along. So far got to 0100 and going much better, though shortly get the up and down Stranraer services which require loco changes.

I am actually enjoying it and a contrast to the slightly earlier set SIAM Carlisle 1973.

The service pattern also got me to wondering how Just Trains are going to set up Carlisle in their forthcoming WCML Over Shap for TSW which should have a 24 hour timetable. Though set in 1986 some of the news and parcels traffic had gone by then but still a lot going on. Will be interesting to see how it handles things!

Vern
Log in to reply
Great But Bewildering 27/08/2024 at 08:53 #158321
kbarber
Avatar
1742 posts
So far as descriptions are concerned, I believe the locations that do & don't have descriptions replicate exactly what was in the real Carlisle PSB. That was in the era when most describer systems were driven by relays or multiselectors, or technology of that era, so came with quite an overhead in terms of space and complexity of circuits. That was also an era when 4-digit train describers were still regarded as something new (I believe the first may have been on Birmingham Snow Hill Panel at the beginning of the 1960s). Prior to that, either signalmen would have been working off bell signals in conjunction with Absolute Block (and some of them in Carlisle in 1979 would probably have worked that system) or describers would just have described approaching trains (the panel commissioned at Waterloo as late as the mid-1980s had describers of that kind and it wasn't until control transferred to the new box at Wimbledon in the early 1990s that Waterloo acquired 4-digit descriptions). So signalmen would be used to keeping an awareness of movements within their control area in their head rather than relying on descriptions and, in 1979, I suspect most shunt movements around the station would go without descriptions being input for them at all.
Log in to reply
The following user said thank you: postal
Great But Bewildering 27/08/2024 at 10:45 #158324
jc92
Avatar
3685 posts
kbarber in post 158321 said:
So far as descriptions are concerned, I believe the locations that do & don't have descriptions replicate exactly what was in the real Carlisle PSB. That was in the era when most describer systems were driven by relays or multiselectors, or technology of that era, so came with quite an overhead in terms of space and complexity of circuits. That was also an era when 4-digit train describers were still regarded as something new (I believe the first may have been on Birmingham Snow Hill Panel at the beginning of the 1960s). Prior to that, either signalmen would have been working off bell signals in conjunction with Absolute Block (and some of them in Carlisle in 1979 would probably have worked that system) or describers would just have described approaching trains (the panel commissioned at Waterloo as late as the mid-1980s had describers of that kind and it wasn't until control transferred to the new box at Wimbledon in the early 1990s that Waterloo acquired 4-digit descriptions). So signalmen would be used to keeping an awareness of movements within their control area in their head rather than relying on descriptions and, in 1979, I suspect most shunt movements around the station would go without descriptions being input for them at all.
Its probably fair to add that in real life there would be several shunters on duty who themselves knew the plan and how best to conduct it, along with umpteen drivers with diagrams in their pockets. In Simsig you have to do a bit of all their jobs following schedules that simply didn't exist on the real thing and would have been a simple phone call request "2 vans P4 to Siding C please mate. Jocko and vans will sit there until XXXX arrives and we'll drop them on the back then"

There's no substitute for the Mk1 pen & paper either - When working Loughborough Central, its not uncommon for the shunter to ring and give us 4-5 moves to be made which get noted down and then worked in order between booked trains and scratched off the list.

"We don't stop camborne wednesdays"
Log in to reply
Great But Bewildering 27/08/2024 at 12:47 #158328
flabberdacks
Avatar
636 posts
Yes, there's definitely an element of that in SimSig - There would definitely be more people involved to coordinate the moves.

In addition to the older Motherwell and New Street timetables, this working can also be found in the Sydney 1983 timetable - one person didn't have to keep track of it all. The move would be called out when it was needed/ready to go, and was not described in any way.

Log in to reply
Great But Bewildering 28/08/2024 at 09:44 #158337
kbarber
Avatar
1742 posts
jc92 in post 158324 said:
kbarber in post 158321 said:
So far as descriptions are concerned, I believe the locations that do & don't have descriptions replicate exactly what was in the real Carlisle PSB. That was in the era when most describer systems were driven by relays or multiselectors, or technology of that era, so came with quite an overhead in terms of space and complexity of circuits. That was also an era when 4-digit train describers were still regarded as something new (I believe the first may have been on Birmingham Snow Hill Panel at the beginning of the 1960s). Prior to that, either signalmen would have been working off bell signals in conjunction with Absolute Block (and some of them in Carlisle in 1979 would probably have worked that system) or describers would just have described approaching trains (the panel commissioned at Waterloo as late as the mid-1980s had describers of that kind and it wasn't until control transferred to the new box at Wimbledon in the early 1990s that Waterloo acquired 4-digit descriptions). So signalmen would be used to keeping an awareness of movements within their control area in their head rather than relying on descriptions and, in 1979, I suspect most shunt movements around the station would go without descriptions being input for them at all.
Its probably fair to add that in real life there would be several shunters on duty who themselves knew the plan and how best to conduct it, along with umpteen drivers with diagrams in their pockets. In Simsig you have to do a bit of all their jobs following schedules that simply didn't exist on the real thing and would have been a simple phone call request "2 vans P4 to Siding C please mate. Jocko and vans will sit there until XXXX arrives and we'll drop them on the back then"

There's no substitute for the Mk1 pen & paper either - When working Loughborough Central, its not uncommon for the shunter to ring and give us 4-5 moves to be made which get noted down and then worked in order between booked trains and scratched off the list.
On top of that, of course, many locations had local nicknames. As did some local trips. So for instance: "When the Double Extra comes off the Dead Shed have him pick up a raft off the New Found Out then down the Linger with him;" to mix jargon from Stratford, Willesden and Cricklewood. Working a big box back in the day could be distinctly 'interesting' and certainly wouldn't be reflected in what happened on the train describers.

Log in to reply
The following user said thank you: flabberdacks
Great But Bewildering 28/08/2024 at 19:00 #158343
58050
Avatar
2659 posts
kbarber in post 158337 said:
jc92 in post 158324 said:
kbarber in post 158321 said:
So far as descriptions are concerned, I believe the locations that do & don't have descriptions replicate exactly what was in the real Carlisle PSB. That was in the era when most describer systems were driven by relays or multiselectors, or technology of that era, so came with quite an overhead in terms of space and complexity of circuits. That was also an era when 4-digit train describers were still regarded as something new (I believe the first may have been on Birmingham Snow Hill Panel at the beginning of the 1960s). Prior to that, either signalmen would have been working off bell signals in conjunction with Absolute Block (and some of them in Carlisle in 1979 would probably have worked that system) or describers would just have described approaching trains (the panel commissioned at Waterloo as late as the mid-1980s had describers of that kind and it wasn't until control transferred to the new box at Wimbledon in the early 1990s that Waterloo acquired 4-digit descriptions). So signalmen would be used to keeping an awareness of movements within their control area in their head rather than relying on descriptions and, in 1979, I suspect most shunt movements around the station would go without descriptions being input for them at all.
Its probably fair to add that in real life there would be several shunters on duty who themselves knew the plan and how best to conduct it, along with umpteen drivers with diagrams in their pockets. In Simsig you have to do a bit of all their jobs following schedules that simply didn't exist on the real thing and would have been a simple phone call request "2 vans P4 to Siding C please mate. Jocko and vans will sit there until XXXX arrives and we'll drop them on the back then"

There's no substitute for the Mk1 pen & paper either - When working Loughborough Central, its not uncommon for the shunter to ring and give us 4-5 moves to be made which get noted down and then worked in order between booked trains and scratched off the list.
On top of that, of course, many locations had local nicknames. As did some local trips. So for instance: "When the Double Extra comes off the Dead Shed have him pick up a raft off the New Found Out then down the Linger with him;" to mix jargon from Stratford, Willesden and Cricklewood. Working a big box back in the day could be distinctly 'interesting' and certainly wouldn't be reflected in what happened on the train describers.
Oh the dreaded 'Linger' The line in-between the Down Hendon & Cricklewood Recess Sdgs albeit at a lower level than the Down Hendon line., been on that many times during the 1980s. I've heard some driver saying that you could spend an entire shift on the 'Linger' without moving a wheel. Hence how that line got it's nickname I suspect.

Log in to reply
The following user said thank you: kbarber
Great But Bewildering 29/08/2024 at 07:56 #158345
kbarber
Avatar
1742 posts
58050 in post 158343 said:
kbarber in post 158337 said:


On top of that, of course, many locations had local nicknames. As did some local trips. So for instance: "When the Double Extra comes off the Dead Shed have him pick up a raft off the New Found Out then down the Linger with him;" to mix jargon from Stratford, Willesden and Cricklewood. Working a big box back in the day could be distinctly 'interesting' and certainly wouldn't be reflected in what happened on the train describers.
Oh the dreaded 'Linger' The line in-between the Down Hendon & Cricklewood Recess Sdgs albeit at a lower level than the Down Hendon line., been on that many times during the 1980s. I've heard some driver saying that you could spend an entire shift on the 'Linger' without moving a wheel. Hence how that line got it's nickname I suspect.
Likewise the 'Golden Mile', from the High Level to Carriage North at Willesden... a *lot* of overtime earned there I reckon. (And more than one stock arrived at Willesden Carriage without a tail lamp when we were short at the Brent, but that's another story.)

Last edited: 29/08/2024 at 07:56 by kbarber
Reason: None given

Log in to reply
Great But Bewildering 29/08/2024 at 15:54 #158355
NorthernWarrior
Avatar
98 posts
Well it was going quite well but now seem to have a bug.

Sent 0T01 into SC to couple on 5T01, which then does a south end shunt to attach on rear 1S09 sat on P3.

However 0T01 is sat there with message "5T01 in front", with 5T01 shown "waiting for 0T01" but there seems no way to force the two together. I could delete 5T01 and abandon the join on 1S09 but then that leaves 0T01 orphaned from it's next working.

Vern
Log in to reply
Great But Bewildering 29/08/2024 at 17:27 #158356
postal
Avatar
5264 posts
NorthernWarrior in post 158355 said:
Well it was going quite well but now seem to have a bug.

Sent 0T01 into SC to couple on 5T01, which then does a south end shunt to attach on rear 1S09 sat on P3.

However 0T01 is sat there with message "5T01 in front", with 5T01 shown "waiting for 0T01" but there seems no way to force the two together. I could delete 5T01 and abandon the join on 1S09 but then that leaves 0T01 orphaned from it's next working.
Two things which may help. Firstly has the TT for 0T01 stepped forward to Carlisle? There are what ere effectively inner and outer reversing locations at Carlisle and if you have reversed at the other reversing point the TT may not have stepped. Secondly you could try using F2 to tell 0T01 to shunt forward. Don't recollect ever seeing the problem during TT testing but the core code has moved on several generations since then so there could be some change which is upsetting things.

“In life, there is always someone out there, who won’t like you, for whatever reason, don’t let the insecurities in their lives affect yours.” – Rashida Rowe
Last edited: 29/08/2024 at 17:27 by postal
Reason: None given

Log in to reply
Great But Bewildering 29/08/2024 at 18:27 #158357
Zecs
Avatar
20 posts
postal in post 158356 said:
NorthernWarrior in post 158355 said:
Well it was going quite well but now seem to have a bug.

Sent 0T01 into SC to couple on 5T01, which then does a south end shunt to attach on rear 1S09 sat on P3.

However 0T01 is sat there with message "5T01 in front", with 5T01 shown "waiting for 0T01" but there seems no way to force the two together. I could delete 5T01 and abandon the join on 1S09 but then that leaves 0T01 orphaned from it's next working.
Two things which may help. Firstly has the TT for 0T01 stepped forward to Carlisle? There are what ere effectively inner and outer reversing locations at Carlisle and if you have reversed at the other reversing point the TT may not have stepped. Secondly you could try using F2 to tell 0T01 to shunt forward. Don't recollect ever seeing the problem during TT testing but the core code has moved on several generations since then so there could be some change which is upsetting things.
It can happen sometimes. It usually means they stopped close to each other, but not so close that they can join. If the shunt forward does not help (because sometimes the loco just doesn't want to move), the ultimate solution is to tell the loco to abandon timetable (be sure to note which timetable it is running to; there can be several for trip locos). The loco will start to move and in a short while it will stop again with "xXxx in front", then instruct the loco to run to another timetable, selecting the correct timetable and location, and they will start joining.

Log in to reply
Great But Bewildering 31/08/2024 at 14:56 #158371
NorthernWarrior
Avatar
98 posts
Tried all those tricks and still stubbornly refused to couple. 5T01 deleted, join on 1S09 abandoned and 0T01 jumped forward to next working. Though that seemed to cause the move to duplicate, just hope I deleted the right one.

Now working through the backlog of trains while sorting that out, next challenge is finding 5S07 as I have an engine asking off Kingmoor to attach on it and 5T02 at the south end to also couple.

Vern
Log in to reply
Great But Bewildering 31/08/2024 at 18:55 #158376
mjkerr
Avatar
195 posts
NorthernWarrior in post 158371 said:
Tried all those tricks and still stubbornly refused to couple
5T01
1S09
0T01
5S07
5T02

If you run into an issue that makes it difficult to understand I tend to let the simulation run for about 10 minutes and then delete all the headcodes apart from the ones I need
I then save it as a new timetable
My latest was saved as Cowlairs TEST ONE
You then reload and it only has the train you require and you can concentrate solely on that one, from when it enters from the south to the north (for Carlisle)

DELETED
Last edited: 31/08/2024 at 18:56 by mjkerr
Reason: None given

Log in to reply
Great But Bewildering 01/09/2024 at 15:08 #158381
NorthernWarrior
Avatar
98 posts
Well luckily my deletions seemed to resolve the issue and 5S07 morphed out of one of the 5Txx. So apart from some horrendous late running (good job I switched disasters off!) things are running fairly smoothly now.

Looking forward to the daytime service starting up. When I get to 0600 I'll post my score so far!

Vern
Log in to reply