Upcoming Games

No games to display

Full list
Add a game

Upcoming Events

No events to display

Forthcoming Timetables

You are here: Home > Forum > General > Timetabling > Forthcoming Timetables

Page 1 of 32

Forthcoming Timetables 22/03/2010 at 14:01 #949
Peter Bennet
Avatar
5420 posts
Online
I am currently working on 3 timetables;-
Sheffield 1983-1984 which will be the first one to be released soon. The other 2 are Peterborough 1980-1981 & Sheffield 1981-1982. If anyone is interested NoisyNoel who has assisted me in compiling Sheffield 1983-1984 will be hosting a multi-player session sometime this week in order to weed out any further issues with this timetable prior to its general release. It is a very busy & difficult timetable to complete, possibly busier than King's Cross.

--------------------------------------------------------------------------------------

Original message from 58050 which I've moved here from Central Scotland as it's general in nature- for some reason by moving it I have become he author!!

Peter

I identify as half man half biscuit - crumbs!
Log in to reply
The following users said thank you: duncan89, VInce, phil1044, seagulls, Coolah, mark bagley
Forthcoming Timetables 22/03/2010 at 14:01 #7654
Peter Bennet
Avatar
5420 posts
Online
I am currently working on 3 timetables;-
Sheffield 1983-1984 which will be the first one to be released soon. The other 2 are Peterborough 1980-1981 & Sheffield 1981-1982. If anyone is interested NoisyNoel who has assisted me in compiling Sheffield 1983-1984 will be hosting a multi-player session sometime this week in order to weed out any further issues with this timetable prior to its general release. It is a very busy & difficult timetable to complete, possibly busier than King's Cross.

--------------------------------------------------------------------------------------

Original message from 58050 which I've moved here from Central Scotland as it's general in nature- for some reason by moving it I have become he author!!

Peter

I identify as half man half biscuit - crumbs!
Log in to reply
The following user said thank you: VInce
Forthcoming Timetables 07/04/2010 at 15:45 #8241
mikehendle
Avatar
10 posts
Hi Peter,

Looking forward to the new Peterborough 1980 activity as I live in Bretton Peterborough is my nearest station.

Michael

Log in to reply
Forthcoming Timetables 15/08/2010 at 11:34 #10728
58050
Avatar
2660 posts
Update on forth-coming timetables. Currently working on Trent 1988-1989 which is about ½ done at present. We tested it last weekend & again this weekend. Yesterday & today from 1400ish. Due to the '2006' era being the only option available at present, some trains have been re-ruted to other locations e.g. Bennerley Sdgs are disconnected therefore the coal trips from Toton have been re-routed to Calverton, Gedling & Cotgrave Collieries. Also due to Nottingham PCD not being on the 2006 trackplan the trains that would normally go there have been re-routed to Eastcroft RR Sdgs instead. Other than that everything else is pretty much in place. I woek all week on this timetable & then run a test session over the weekends. Hopefully this timetable should be ready within the next 2-3 weeks if all goes to plan. Next Update next weekend.
Log in to reply
Forthcoming Timetables 23/08/2010 at 17:32 #10925
officer dibble
Avatar
410 posts
I have almost got a 2010 Gloucester TT ready once it has been tested by those that have a copy of it. I am currently compiling information for an Exeter 2010 TT & once I gain local knowledge of Scottish freight workings (consists namely) an Edinburgh 1996. If anyone here has information on the workings of 1996 around the Edinburgh area & workings on/to Mossed that would be fantastiche. All will be dealt with in the fullness of time.
When in doubt - Contingency plan 2A. Someone didn't buy the milk - 2A. Someone sneezed at Swansea - 2A. A driver complains the cab is too cold - 2A. Unable to operate a HEx service 4 vice 8 - 2A. Points failure at Ipswich - 2A. Landslip at Pitlochry - 2A
Log in to reply
Forthcoming Timetables 09/09/2010 at 19:44 #11338
Chrisrail
Avatar
384 posts
Update Here we go

Gloucester April 2010 ........................................Ready to go in a couple of weeks
Stafford April 2010 ........................................Ready to be released after a few minor tweaks (Freight lengths)
Bristol April 2010 ...........................................About 6 weeks to release
CSot April 2010 ...........................................About 2 months then ready for testing
NEScot April 2010 ...........................................Minor tweaking (Time Factor)
Exeter April 2010 ...........................................About a month for release
Brighton August 2010 .......................................About 2 months
Swindid August 2010 ........................................6 Weeks unless ARS gets the better of me..

Log in to reply
The following users said thank you: phil1044, Vortexhaha
Forthcoming Timetables 09/09/2010 at 20:03 #11341
ipswich
Avatar
247 posts
Chrisrail said:
Brighton
is that in devlopment then

Log in to reply
Forthcoming Timetables 09/09/2010 at 20:31 #11343
UKTrainMan
Avatar
1803 posts
ipswich said:
Chrisrail said:
Brighton
is that in devlopment then
Yes.

Any views and / or opinions expressed by myself are from me personally and do not represent those of any company I either work for or am a consultant for.
Log in to reply
Forthcoming Timetables 10/09/2010 at 20:16 #11367
bill_gensheet
Avatar
1435 posts
Online
Update from me:
CSCOT 1993 and a minor update to EDIN1993 to match - a month or two
NESCOT1993 - possibly, would be nice to get the full set. Depends how the initial testing goes.
CSCOT1985, EDIN 1985 yes, but probably worked on mainly over Christmas so out next year
KX 'simple' 1964 is longer term now as it's too much fun TT'ing in Scotland.

Bill

Log in to reply
Forthcoming Timetables 11/09/2010 at 16:59 #11386
Quizman
Avatar
276 posts
Base timetable for KX 1955 (all steam) now being tested. Turned out to be a tad more difficult than originally invisaged and requires a bit of logistical giggery pokerey. In the usual phrase 'it'll be ready when it's ready'.
Log in to reply
Forthcoming Timetables 11/09/2010 at 17:25 #11389
officer dibble
Avatar
410 posts
Further update from me:
Gloucester 2010 - being tested and will need a few minor updates.
KX 2010 (5 September) Welwyn Viaduct closure - being worked upon, FCC & Engeineers services to unravel, then testing required.
Edinburgh 1996 - In the planning stages at the moment, and subject to information at the Derby meet.

When in doubt - Contingency plan 2A. Someone didn't buy the milk - 2A. Someone sneezed at Swansea - 2A. A driver complains the cab is too cold - 2A. Unable to operate a HEx service 4 vice 8 - 2A. Points failure at Ipswich - 2A. Landslip at Pitlochry - 2A
Log in to reply
Forthcoming Timetables 29/12/2010 at 15:32 #13017
jdtech
Avatar
69 posts
I'm currently working on a December SX 2010 timetable for Southampton; essentially an update of my SX 2009 timetable but with some corrections, updates and new workings. Should be finished by the end of January.
Log in to reply
Forthcoming Timetables 20/01/2011 at 19:39 #13259
Quizman
Avatar
276 posts
Quizman said:
Base timetable for KX 1955 (all steam) now being tested. Turned out to be a tad more difficult than originally invisaged and requires a bit of logistical giggery pokerey. In the usual phrase 'it'll be ready when it's ready'.
Pleased to advise that timetable has now been uploaded after as much testing as possible (I'm sure there will be issues but thats all the fun of the fair).
If all goes to plan I will be playing the Fat Controller sometime Fri/Sat/Sun and will advise via the Hosting Forum - unless someone else beats me to it!

Log in to reply
Forthcoming Timetables 21/01/2011 at 06:31 #13270
peterb
Avatar
452 posts
My timetables:

Edinburgh Winter 2009/10 - in alpha testing
Central Scotland - Winter 2009/10 - considering viability
Edinburgh/Central Scotland 1992 - considering viability
Edinburgh fictional - considering viability
Another Trent - maybe.

Log in to reply
Forthcoming Timetables 21/01/2011 at 10:05 #13273
BarryM
Avatar
2158 posts
Quizman said:
Pleased to advise that timetable has now been uploaded after as much testing as possible

Where has it been uploaded too or is it still in the "to be processed" file?

Barry

Barry, Sydney, New South Wales, Australia
Log in to reply
Forthcoming Timetables 21/01/2011 at 10:28 #13274
Meld
Avatar
1113 posts
In Progress

Exeter 1981-2 Weekday (now at Alpha)
Sheffield 2011 Sunday - (to compliment Officer Dibbles weekday t/t)

Passed the age to be doing 'Spoon Feeding' !!!
Log in to reply
Forthcoming Timetables 21/01/2011 at 13:45 #13277
bill_gensheet
Avatar
1435 posts
Online
bill_gensheet said:
:
CSCOT 1993 and a minor update to EDIN1993 to match - a month or two
NESCOT1993 - possibly, would be nice to get the full set. Depends how the initial testing goes.
CSCOT1985, EDIN 1985 yes, but probably worked on mainly over Christmas so out next year
KX 'simple' 1964 is longer term now as it's too much fun TT'ing in Scotland.

Update for Jan 2011
CSCOT and EDIN 1993 are ready but need the next sim version; CSCOT for functionality and EDIN for ARS compatibility.
CSCOT 1985 passenger workings have been written and are debugging. Freight to add.
EDIN 1985 will probably follow that, although most of my research is done as it has to match CSCOT.

Bill

Log in to reply
Forthcoming Timetables 21/01/2011 at 14:35 #13279
hotwellian
Avatar
211 posts
BarryM said:
Quizman said:
Pleased to advise that timetable has now been uploaded after as much testing as possible

Where has it been uploaded too or is it still in the "to be processed" file?

Barry

Hi Barry, it is there on page 2 of the KX timetables at Kings Cross Summer 1955 Steam WTT

Log in to reply
Forthcoming Timetables 22/01/2011 at 22:30 #13304
BarryM
Avatar
2158 posts
hotwellian said:
Hi Barry, it is there on page 2 of the KX timetables at Kings Cross Summer 1955 Steam WTT

Ah! Thanks Hotwellian. The majority of Paging in the Forum is shown on the left hand side. I did not notice it on the right of the Timetable List.
Barry

Barry, Sydney, New South Wales, Australia
Log in to reply
Forthcoming Timetables 23/01/2011 at 23:32 #13324
Simdmuk
Avatar
155 posts
Just to add to the lists...

I'm about 3/4 way through Exeter Summer Saturday 1985 to compliment the Sunday timetable and Exeter 1985 (weekdays). This is a casual project and will need some testing so cannot really give any realistic time estimate.

Log in to reply
Forthcoming Timetables 31/05/2011 at 21:01 #16208
Chrisrail
Avatar
384 posts
Gloucester - April 2011 ready to go in about a week - just putting Engineering trains in.
Stafford - May 2011 two versions one with Engineering one with out
Exeter & Westbury April 2011 sent to Peter
Sheffield - New TT - June 2011 - 33% done
SwinDid - April 2011 - 60% done

Plus others

Log in to reply
Forthcoming Timetables 31/05/2011 at 21:47 #16212
Sam Tugwell
Avatar
494 posts
Exeter May Bank Holiday 2011 due for testing sometime in the Holidays.
"Signalman Exeter"
Log in to reply
Re: Forthcoming Timetables 04/08/2011 at 12:22 #19087
Simdmuk
Avatar
155 posts
Hi all

Just an update...

Exeter Summer Saturday 1985........... Complete,needs a few tweaks and test.

Exeter summer Sunday 1980............ Complete,needs a few tweaks and test.

Gloucester July 1980 (weekdays) ........About half way through this.

Also works in progress:-

Trent Weekdays 1991 Long term project.

Trent 2011 Fictional Done most of the passenger services,got freight etc to do

I'm hoping to finish and release the WR timetables soonish ,then Trent fictional with a gap (for a rest from the screen !) for Trent 1991.

Log in to reply
Re: Forthcoming Timetables 04/08/2011 at 12:59 #19093
sam365
Avatar
11 posts
" said:
Further update from me:
KX 2010 (5 September) Welwyn Viaduct closure - being worked upon, FCC & Engeineers services to unravel, then testing required.
Edinburgh 1996 - In the planning stages at the moment, and subject to information at the Derby meet.
Now that I'm looking forward to! Do you have any plans to release a standard version of that timetable without the closure?

Log in to reply
Re: Forthcoming Timetables 04/08/2011 at 13:05 #19094
officer dibble
Avatar
410 posts
Well, I had a monumental Laptop failure a while back, and lost the lot. Which was a shame, as I had completed 99% of it and was working through the engineering moves.

I also lost my Sheffield TT, my Bristol TT, and a couple of others I had begun "ground work" on.

Very frustrating indeed. I learnt from it though, and back everything up to my USB stick now :cheer:

Regarding up and coming TTs, I have a couple of projects lined up for the London meet sims, keep the old mince pies peeled

When in doubt - Contingency plan 2A. Someone didn't buy the milk - 2A. Someone sneezed at Swansea - 2A. A driver complains the cab is too cold - 2A. Unable to operate a HEx service 4 vice 8 - 2A. Points failure at Ipswich - 2A. Landslip at Pitlochry - 2A
Log in to reply