Upcoming Games

(UTC times)


Full list
Add a game

Upcoming Events

No events to display

Who's Online

Person82, 442s3, jem771, iantrimnell, uboat (5 users seen recently)

Forthcoming Timetables

You are here: Home > Forum > General > Timetabling > Forthcoming Timetables

Page 20 of 31

Forthcoming Timetables 21/06/2020 at 10:13 #127743
postal
Avatar
5265 posts
ajax103 in post 127740 said:
Thank you, one question though about your WCML Covid19 timetables and when you say the they will be re-released, will they have as a example in the timetable title: WCML Covid Timetables 230420 - Rugby Centre for example? So one knows that they are the latest version of that timetable.
As I understand it, there is a SimSig policy decision that TTs released through the site should not have any version information included in the title. This is required for those TTs bundled with a sim so that they can be updated automatically through the Update process. This has been carried over into user-contributed TTs in the interests of consistency.

If you want to check the compare the version number of a TT available in the Download section with the version you currently have, click on the link to Details where the TT writer should show the version number.

“In life, there is always someone out there, who won’t like you, for whatever reason, don’t let the insecurities in their lives affect yours.” – Rashida Rowe
Log in to reply
Forthcoming Timetables 21/06/2020 at 10:25 #127744
Chrisrail
Avatar
384 posts
postal in post 127743 said:
ajax103 in post 127740 said:
Thank you, one question though about your WCML Covid19 timetables and when you say the they will be re-released, will they have as a example in the timetable title: WCML Covid Timetables 230420 - Rugby Centre for example? So one knows that they are the latest version of that timetable.
As I understand it, there is a SimSig policy decision that TTs released through the site should not have any version information included in the title. This is required for those TTs bundled with a sim so that they can be updated automatically through the Update process. This has been carried over into user-contributed TTs in the interests of consistency.

If you same want to check the compare the version number of a TT available in the Download section with the version you currently have, click on the link to Details where the TT writer should show the version number.
Morning All

They have all been tinkered / modified. They will be uploaded together with the same discription / notes. Those will be the ones you want

Log in to reply
The following user said thank you: ajax103
Three Bridges April 2012 21/06/2020 at 12:08 #127755
TimTamToe
Avatar
664 posts
Hi All,

Apologies for the delay, it's been a difficult time recently. Nothing too major has cropped up in testing so far, just a few "Homer" moments to sort really. The other issue regarding lengths at West Croydon is on Mantis and hopefully will be corrected in the next sim update, to save me having a bit of tinkering to do.

G

Log in to reply
The following user said thank you: bri2808
Forthcoming Timetables 27/06/2020 at 16:40 #128246
GW43125
Avatar
495 posts
An update on Rugby December 2018.

Train entry is almost complete, save for a couple of troublesome test trains.
Then I've just got the gremlins to deal with (one day I'll learn not to mix water and small creatures), but I should be heading into testing in the next couple of weeks, provided there are no major catastrophes.

Sorry to keep you all waiting, but now Uni is out the way development has sped up somewhat!

Log in to reply
Forthcoming Timetables 29/06/2020 at 15:33 #128532
jc92
Avatar
3687 posts
With Chester finally released I can confirm I'm currently working on a "wales and NW 1991" set of timetables, which will cover Hereford, Shrewsbury, NE Wales, Madeley (should it be produced) Chester, NWC, Cheshire Lines and potentially Warrington if I ever get the time.

Shrewsbury and Hereford are almost complete and NE wales is part written. NWC is released but will require some UID updates to chain correctly. Cheshire lines is almost complete but will require a chainable version to chester without the services using the line between Mouldsworth and Helsby.

There is also some provision way down the line for some of Whatleps 1991 Manchester area timetables to have chainable versions created aswell, although I'm not guaranteeing this at all.

"We don't stop camborne wednesdays"
Log in to reply
The following users said thank you: sloppyjag, bossman, Phil-jmw
Forthcoming Timetables 29/06/2020 at 20:25 #128554
whatlep
Avatar
377 posts
While JC92 is doing 1991 for the Mid Cheshire line, I'm working on 1985, plus either 1987 or 1989. 1977 is a gleam in the eye too, but that'll have to wait for some Mantis fixes.

I'm pondering doing 1985 for the Chester sim too, unless that conflicts with someone else's activity.

Log in to reply
The following user said thank you: Phil-jmw
Forthcoming Timetables 02/07/2020 at 20:17 #128827
swiftaw
Avatar
271 posts
officer dibble in post 122668 said:


- Birmingham New Street Summer Saturday 1992 (all XC services in & nearly finished the WC services).
If you need a tester for this, I'm willing

Log in to reply
Forthcoming Timetables 03/07/2020 at 11:31 #128863
whatlep
Avatar
377 posts
whatlep in post 128554 said:
While JC92 is doing 1991 for the Mid Cheshire line, I'm working on 1985, plus either 1987 or 1989. 1977 is a gleam in the eye too, but that'll have to wait for some Mantis fixes.

I'm pondering doing 1985 for the Chester sim too, unless that conflicts with someone else's activity.
Just to expand on my previous post, 1985 and 1989 are in active development and not far off ready, subject to a couple of Sim FAQ items being sorted. 1989 is a real challenge with trains at under 10 minute intervals on the "country" section of the line in the evening peak and reversals at Plumley West.

Log in to reply
Forthcoming Timetables 11/08/2020 at 17:14 #130564
officer dibble
Avatar
409 posts
- New Street 1992 has been completed, however as I am totally useless at trying to timetable joins and splits on mail trains without tying the station in knots, a kind-hearted soul is currently running through them so they make sense and to sort the issues I have given them!

- New Street Summer 2020 Trent Valley diversions for the weekend of the 25th & 26th July are progressing well, with unit allocations well under way on the Saturday TT. Once completed I will do the same to the Sunday TT.

When in doubt - Contingency plan 2A. Someone didn't buy the milk - 2A. Someone sneezed at Swansea - 2A. A driver complains the cab is too cold - 2A. Unable to operate a HEx service 4 vice 8 - 2A. Points failure at Ipswich - 2A. Landslip at Pitlochry - 2A
Log in to reply
The following users said thank you: GeoffM, JamesN, ccobh, ajax103, bri2808, haydenrobertson, Rossy, sloppyjag, Phil-jmw, bossman, phil1044
Forthcoming Timetables 12/08/2020 at 09:44 #130576
phil1044
Avatar
161 posts
Just to add my latest project into the list.
I'm currently re-writing my Leeds East West Summer 2018 timetable (which will end up as version 3), sorting a few timetable errors and doing a bit of tidying up, as well as giving all trains their official UIC number.
On top of this I'm compiling a new Leeds North West timetable for the same period which will then chain with the East West timetable. They will both be released at the same time when completed and tested.
Both timetables will be my usual 5 day Mon-Fri with lots of rules to make it as real (and mischievous) as possible.

Phil.

Log in to reply
The following users said thank you: VInce, haydenrobertson
Forthcoming Timetables 12/08/2020 at 13:15 #130580
bill_gensheet
Avatar
1413 posts
3 Central Scotland updates in the approval loop
The 'training' timetable
1993 - passenger only
1993 - full, now with 'day of the week' decision covering Tuesday to Friday.
These now chain to the Edinburgh / Motherwell timetables.

Next off will be a 1984 compatible set for CSCOT (significant update), Motherwell (minor update) and Edinburgh (new).
A revised Cowlairs 1984 will also come out.

Bill

Log in to reply
The following users said thank you: tynie123, Splodge, phil1044, Phil-jmw
Forthcoming Timetables 31/08/2020 at 13:59 #131141
Champs450007
Avatar
97 posts
Feltham 2020 timetable currently about 60% completed from the saturday just gone with engineering works between Twickeham/Hounslow - Staines with some services doing shunts at Twickenham and all services at Staines doing shunts. Bit of creative license with one shunt at Staines because of a shunt signal not in the timetable editor and 10 Car 458's reduced to 160m from 200m to fit in Reading 4A/B platforms.
Log in to reply
The following user said thank you: phil1044
Southern April 2012 Series 01/09/2020 at 11:00 #131172
TimTamToe
Avatar
664 posts
Hi All,

Updates as follows...

The majority are all ready for release just a few things to tweak or check. I'm planning to update / release all of them together so that they all should be compatible for chaining.

I'm just waiting for the version history changes to the sims, to see what I may need to tinker with, as on first looking, a previously sorted pathing problem in London Bridge around New Cross Gate as crept back in since the latest sim update

Three Bridges April 2012 - Just need to double check what has been updated in sim and write description / notes etc
London Bridge April 2012 - Pathing error has crept back in - needs developer attention
Horsham April 2012 - Ready
Oxted April 2012 - Ready
East Coastway April 2012 - Ready
Victoria Central & South Eastern April 2012 - Need to check since sim updates

Cheers
Gareth

Log in to reply
The following users said thank you: phil1044, bri2808
Forthcoming Timetables 01/09/2020 at 13:29 #131181
madaboutrains
Avatar
316 posts
Champs450007 in post 131141 said:
Feltham 2020 timetable currently about 60% completed from the saturday just gone with engineering works between Twickeham/Hounslow - Staines with some services doing shunts at Twickenham and all services at Staines doing shunts. Bit of creative license with one shunt at Staines because of a shunt signal not in the timetable editor and 10 Car 458's reduced to 160m from 200m to fit in Reading 4A/B platforms.
Now that would be intresting to play the service which I planned for work!.

Bit of a pain the Up Main shunt signal at Staines isnt in the SimSig tho.

RIP Feltham Panel 1
Log in to reply
Forthcoming Timetables 01/09/2020 at 14:18 #131184
Champs450007
Avatar
97 posts
I thought the same about seeing the 2 Kingston rounders I drove saturday with a 458 lol.

Yeah annoying really F467 is there but there's no location for it in the timetable editor so having to use F461.

Log in to reply
The following user said thank you: madaboutrains
Forthcoming Timetables 01/09/2020 at 14:26 #131185
whatlep
Avatar
377 posts
Manchester Piccadilly heritage timetables are gradually getting looked at and updated where possible for the ARS version of Piccadilly. 1996 and 1989 will be first to be reissued. I'll start a separate thread to track progress.
Log in to reply
The following user said thank you: phil1044
Forthcoming Timetables 01/09/2020 at 18:44 #131207
Steamer
Avatar
3985 posts
Champs450007 in post 131184 said:
I thought the same about seeing the 2 Kingston rounders I drove saturday with a 458 lol.

Yeah annoying really F467 is there but there's no location for it in the timetable editor so having to use F461.
I've logged a request for it to be added (#31459), but the developer is no longer active, so don't hold your breath.

"Don't stress/ relax/ let life roll off your backs./ Except for death and paying taxes/ everything in life.../ is only for now." (Avenue Q)
Log in to reply
The following users said thank you: madaboutrains, Champs450007
Forthcoming Timetables 24/09/2020 at 16:17 #132664
bill_gensheet
Avatar
1413 posts
bill_gensheet in post 130580 said:

Next off will be a 1984 compatible set for CSCOT (significant update), Motherwell (minor update) and Edinburgh (new).
A revised Cowlairs 1984 will also come out.
On the plus side, Edinburgh 84 now has all the trains in place, and now under test at v0.1.
As with many heritage timetables I expect this is a fair amount of work as the trip notice (1981), the freight timetables (1983/1984) and the passenger timetable (May 1984) were not all applicable on the same day.

On the minus side, Motherwell 84 now needs much more work with 200+ trains needing to be fixed on top of the chain amendments for Edinburgh.

Bill

Log in to reply
The following users said thank you: Soton_Speed, lazzer, phil1044
Forthcoming Timetables 16/10/2020 at 19:23 #133136
Rocangus
Avatar
52 posts
As posted elsewhere, started P'borough 2020 summer weekday just now and working hard on that.
Log in to reply
Forthcoming Timetables 17/11/2020 at 15:07 #133936
GW43125
Avatar
495 posts
I have started a Marylebone November 2020. This will consist of two versions, one with LUL and one without.
Aiming for a release at some point around Christmas or early next year, uni permitting.

Log in to reply
The following user said thank you: haydenrobertson
Forthcoming Timetables 17/11/2020 at 15:14 #133937
haydenrobertson
Avatar
56 posts
GW43125 in post 133936 said:
I have started a Marylebone November 2020. This will consist of two versions, one with LUL and one without.
Aiming for a release at some point around Christmas or early next year, uni permitting.
Christmas 2022?

Log in to reply
Forthcoming Timetables 17/11/2020 at 15:22 #133939
GW43125
Avatar
495 posts
haydenrobertson in post 133937 said:
GW43125 in post 133936 said:
I have started a Marylebone November 2020. This will consist of two versions, one with LUL and one without.
Aiming for a release at some point around Christmas or early next year, uni permitting.
Christmas 2022? ;)
You, sir, are a git.

[Admins: we're just having a laugh, please don't have a go at him]

Log in to reply
The following user said thank you: haydenrobertson
Forthcoming Timetables 17/11/2020 at 18:45 #133946
phil1044
Avatar
161 posts
My next timetable for release will be West Yorkshire Oct 2018, again a 5 day timetable based on what actually ran that week. It will chain with my other three Leeds area timetables from the same week when finished.
The passenger side is now finished, the freight is proving a bit more awkward tho so bear with me.
Should be a good 'un tho !

Log in to reply
The following users said thank you: headshot119, Mikhail, Soton_Speed
Forthcoming Timetables 17/11/2020 at 22:35 #133958
haydenrobertson
Avatar
56 posts
I have started "Manchester SX November 2020" timetable. It will be based on Friday 6th November this year, and will include everything on that day that actually run. It may include a couple extra things (like test train etc) who knows? I haven't got to that part yet.

So far, the Avanti, TPE, TfW and only a handful Northern services have been added so far.

I have the rest of the Northern services, along with all of the XC CrossCountry to implement.

Freight is on the todo list. But is going to be quite the challenge.

Log in to reply
Forthcoming Timetables 17/11/2020 at 23:38 #133959
Splodge
Avatar
719 posts
Doh - I’ve just started one based on Friday 13th as much if it can be derived from my earlier 2020 TT. I’ll put mine on hold, no point in having two just a week apart as the only thing different will be a few ECS moves.
There's the right way, the wrong way and the railway.
Log in to reply