Upcoming Games

(UTC times)


Full list
Add a game

Upcoming Events

No events to display

Port Talbot - April 2021

You are here: Home > Forum > Simulations > Timetables > Port Talbot > Port Talbot - April 2021

Page 1 of 1

Port Talbot - April 2021 13/04/2021 at 20:28 #138568
Newhampshires
Avatar
101 posts
LINK: https://www.SimSig.co.uk/File/Details/2584

A typical week-day timetable between December 2020 and May 2021 on the South Wales Main Line. This timetable features the services which ran on April 2, 2021.

The Flying Banana New Measurement Train (1Z20) makes an appearance around 8am entering at Pontyclun, making its way to Swansea, before turning back and exiting via Pontyclun.

Trains coming from Cowbridge Road used Platform 1 on this day, rather than the usual Platform 1A. (for reasons unknown to this author)

Trains between Trostre Steel Works and Margam T.C. are unable to follow the real-life routing, so they are routed via the District Line to/from Margam Knuckle Yard.

A Colas Rail Tamper Machine ran from Shrewsbury to Llanelli and terminated there in real life, however, its next movement is unknown, so it's programmed to run through Llanelli.

A service running 649O terminates at Port Talbot Up Sdgs, however the sim does not provide any routing to this location when writing a timetable. The train instead exits the sim via Briton Ferry Sidings. This service is a Colas Rail Tamper Machine, which is indeed normally housed at Port Talbot Up Sdgs.

A steam train service (1Z30) from Crewe to Carmarthen Sidings failed at Llandeilo station due to "severe wheel flats". This resulted in the severing of services on the Heart of Wales line from 15:55 onwards. The steam train was rescued around 23:00 and brought back to its scheduled destination. (Credit: https://live.rail-record.co.uk/train/?c=U91171&d=02/04/2021) The train on the line behind the failed steam train, 2V12, suffered a near 2.5hr delay at Llandovery - This 2V12 service (Credit: https://live.rail-record.co.uk/train/?c=G97193&d=02/04/2021) eventually made its way to Carmarthen around midnight (Credit: https://live.rail-record.co.uk/train/?c=14488&d=02/04/2021). This is all simulated within this timetable.

Check out my other Welsh simulations: North Wales Coast, Northeast Wales, & Shrewsbury.

Please post below any feedback, observations, corrections for Port Talbot. Thanks!

Log in to reply
Port Talbot - April 2021 13/04/2021 at 20:39 #138570
Steamer
Avatar
3997 posts
Newhampshires in post 138568 said:


Trains coming from Cowbridge Road used Platform 1 on this day, rather than the usual Platform 1A. (for reasons unknown to this author)
There appears to be a reporting glitch where trains are reported as arriving in platform 1, but departing from platform 1A, and Real Time Trains bears this out. I'd therefore assume everything used P1A as usual.

"Don't stress/ relax/ let life roll off your backs./ Except for death and paying taxes/ everything in life.../ is only for now." (Avenue Q)
Log in to reply
The following user said thank you: Newhampshires
Port Talbot - April 2021 13/04/2021 at 21:28 #138573
Newhampshires
Avatar
101 posts
Steamer in post 138570 said:
Newhampshires in post 138568 said:


Trains coming from Cowbridge Road used Platform 1 on this day, rather than the usual Platform 1A. (for reasons unknown to this author)
There appears to be a reporting glitch where trains are reported as arriving in platform 1, but departing from platform 1A, and Real Time Trains bears this out. I'd therefore assume everything used P1A as usual.
¯\_(ツ)_/¯ -- Enjoy the added challenge! Thank you for posting!

Last edited: 13/04/2021 at 21:28 by Newhampshires
Reason: None given

Log in to reply
Port Talbot - April 2021 13/04/2021 at 21:37 #138574
Newhampshires
Avatar
101 posts
Also, it should be noted that I did try to find a reason why the platform may have been disabled and I wasn't able to find anything. With the waters being muddy, I chose to use the platform the trains were reported as arriving at.

With this being what's reflected in the simulation, it does provide an added challenge with converging services at platform 1 throughout the day, but I can assure anyone that through testing, I identified there are nearly zero conflicts with this platform change (whether correctly or incorrectly reported).

Log in to reply