Page 1 of 1
Brighton, P2 26/04/2022 at 21:24 #146282 | |
DaveHarries
1285 posts |
Hi, I am trying to compile a timetable which is partly built around engineering works in the Brighton area. Those works rule out use of Platforms 4 to 8 leaving only 1, 2 and 3 in use. The TT is being built around the WTT for Sunday 08th May 2022. On that day train 5A89 from Lovers Walk T&RSMD is scheduled to enter from Lovers Walk on the WCR (West Carriage Road) and then forms 1A89 (0534 Brighton - London Victoria). 5A89 can only occupy the space between Signal T661 and the end of the line at Brighton station. Two queries therefore: 1. What would be the maximum train length permitted for that section of platform for trains coming into P2 from the Lovers Walk (West Carriage Road)? 2. Please could I suggest that the answer to 1, above, be added to the Wiki for TBASC as has been done with Platform 3 for trains from the Hove direction? Cheers, Dave Log in to reply |
Brighton, P2 26/04/2022 at 23:22 #146283 | |
GeoffM
6376 posts |
Done, 200m.
SimSig Boss Log in to reply The following user said thank you: DaveHarries |