London Bridge 2009 Timetable

You are here: Home > Forum > Simulations > Timetables > London Bridge > London Bridge 2009 Timetable

Page 1 of 1

London Bridge 2009 Timetable 10/05/2023 at 20:16 #151754
northroad
Avatar
872 posts
When looking at the CWN for this period it shows some ECS movements from Grove Park Shed are routed via the Carriage Washing Machine and then on to Lee Spur Junction. 5N24 being just one example.
If you run the sim this service actually goes from the Shed onto the Down Slow and thence to Lee Spur Junction thus avoiding the CWM.
I ask this question as I have tried to compile another timetable from an earlier era but when you try to route a service through the CWM and then do an analyse of the timetable it suggests that Lee Spur Junction is out of order.
if I take out the CWM routing and then analyse the the timetable has no problem and validates correctly.
Is there a way of routing via the CWM directly from the Shed or am I missing out something.
The compiler of the 2009 timetable may have experienced the same problem and just routed via the slow and onto Lee Spur.

Geoff

Log in to reply
London Bridge 2009 Timetable 10/05/2023 at 20:32 #151756
GeoffM
Avatar
6380 posts
If you put the washer locations in it should be ok:
Enter Grove Park Shed L132x
Washer W1/W2 (with platform code)
Washer W3/W4 (with platform code)
Lee Spur Jn
etc.

[Edit] Mantis 38647 and Mantis 38646

SimSig Boss
Last edited: 10/05/2023 at 20:38 by GeoffM
Reason: None given

Log in to reply
The following user said thank you: northroad
London Bridge 2009 Timetable 10/05/2023 at 20:52 #151760
northroad
Avatar
872 posts
Thanks for that Geoff. That worked fine. In my defence I was assuming that the location Grove Park Wash Road was the only way to route this.
Would I be correct in assuming what you have indicated is the routing for the opposite direction into the shed via the washer.
If that is the case where does the location that I assumed to be correct actually located or is it in fact required.

Geoff

Log in to reply
London Bridge 2009 Timetable 10/05/2023 at 21:11 #151761
GeoffM
Avatar
6380 posts
Ah, I think the sim needed the two separate locations for routing purposes (for ARS), whereas in real life they just had the one location... which isn't used.

I haven't tried the reverse but it should be the same reversed.

SimSig Boss
Log in to reply
The following user said thank you: northroad